Laserfiche WebLink
10/4/2019 Page 1 <br /> City of Everett <br /> 7:51:46AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E1909-004 Site Address 4611 RIVERFRONT BLVD <br /> Applied 9/3/2019 Applicant Lot <br /> Approved 9/3/2019 Owner POLYGON WLH LLC Block <br /> Issued 9/3/2019 Contractor GARNER ELECTRIC WASHINGTON LLC Tract <br /> Parent Permit No. C1907-009 Description 100AMP TEMP POWER FOR LOT 306 <br /> Notes PLAN#2645 B LOT#306 <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 10/2/2019 10/2/2019 ELEC 01-TEMP SKB CORRECTION eTRAKiT Inspection 10/1/2019 1:57 PM Paul Vantol <br /> SERVICE Request <br /> Contact Name:Paul Vantol <br /> Site Address:4611 RIVERFRONT BLVD <br /> Phone:2532787064 <br /> e-Mail:Pvantol@gweusa.com <br /> (10/2/2019 11:51 AM SKB) <br /> Grounding electrode conductor must land <br /> on the ground bus.It cannot rely on the can. <br /> 10/3/2019 10/3/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> 10/3/2019 10/3/2019 ELEC 01-TEMP SKB APPRVD-PERN eTRAKiT Inspection 10/2/2019 2:30 PM Paul Vantol <br /> SERVICE Request <br /> Contact Name:Paul Vantol <br /> Site Address:4611 RIVERFRONT BLVD <br /> Phone:2532787064 <br /> e-Mail:Pvantol@gweusa.com <br /> INSP12 CAWS YSTEMS <br />