G Eo r I u FIELD REPQRT <br /> of3 ) <br /> Project Name: Everett River Front-Simpson Report: 164 <br /> GeoDesign# : Polygon-127-03 Date: 10/09/2019 <br /> I Reports with Unresolved Nonconformance Issues: Permit: <br /> PW1505-005 <br /> Randy Allen(City of Everett) Michelle Dittman(Polygon) Weather: Sunny, 30's <br /> Ron Bowen(Polygon) Amy Pickett(Superior Concrete) Arrival/Departure: 1000/1100 <br /> Distribution: _... <br /> Kyler Meek(Polygon) <br /> Stephen Farnan(Polygon) Prepared By: Aubrey Hodgins <br /> Attachments: m Site Plan(s) m Density Test Summary Signature: <br /> ❑ Installation Records ❑ Other .Reviewed By: z�z <br /> PURPOSE of VISIT: GeoDesign representative, Aubrey Hodgins,was on-site part time at the request of Craig with DDS to <br /> observe foundation subgrade for Lots 302 and 303. <br /> SUMMARY OF OBSERVATIONS: <br /> Lots 302 and 303: <br /> Today, GeoDesign noted that DDS had completed excavation of the foundation and crawl space areas for Lots 302 and <br /> 303. We noted that the exposed foundation subgrade generally consisted of a gray silty SAND with gravel that could be <br /> probed less than 2 inches using a 1/2 inch diameter soil probe. No over-excavation was necessary for Lots 302 or 303. <br /> Relative compaction of the exposed foundation subgrade was tested using a Troxler Moisture-Density gauge; in-place <br /> density tests indicated that the exposed material had been generally compacted to 95%to 98% of its maximum dry density <br /> as determined by a Modified Proctor analysis. <br /> It is our opinion that the exposed foundation subgrade for Lots 302 and 303 observed today is currently suitable for support <br /> of the intended structure. A summary of our observations can be found in the attached Figure 1. The contractor was <br /> notified of our observations prior to our departure from the site. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include supervision or direction of the contractor,the contractor's employees <br /> or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations. The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By'section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br />