Laserfiche WebLink
Construction Stormwater General Permit <br /> Stormwater Pollution Prevention Plan <br /> (SWPPP) <br /> for <br /> Riverside Business Park <br /> Prepared for: <br /> The Washington State Department of Ecology <br /> Northwest Regional Office <br /> Permittee/ Owner Developer Operator/ Contractor <br /> Port of Everett N/A TBD <br /> Everett, WA <br /> Update as necessary. <br /> Certified Erosion and Sediment Control Lead (CESCL) <br /> Name Organization Contact Phone Number <br /> TBD TBD TBD <br /> SWPPP Prepared By <br /> Name Organization Contact Phone Number <br /> Christopher Rapp, EIT KPFF Consulting Engineers (206) 622-5822 <br /> SWPPP Preparation Date <br /> 3/17/2017 <br /> Project Construction Dates <br /> Activity / Phase Start Date End Date <br /> Site Work 7/12/2017 12/20/2017 <br />