Laserfiche WebLink
2 Construction Stormwater Best Management Practices (BMPs) <br /> The SWPPP is a living document reflecting current conditions and changes throughout the life <br /> of the project. These changes may be informal (i.e., hand-written notes and deletions). Update <br /> the SWPPP when the CESCL has noted a deficiency in BMPs or deviation from original design. <br /> 2.1 The 13 Elements <br /> 2.1.1 Element 1: Preserve Vegetation / Mark Clearing Limits <br /> Prior to earthmoving activities, the clearing limits will be staked and marked with high visibility <br /> fence to ensure protection of native vegetation. <br /> List and describe BMPs: C101 — Preserving Natural Vegetation, C102—Buffer Zones, C103— <br /> High Visibility Fence <br /> Installation Schedules: Prior to earthmoving. <br /> Inspection and Maintenance plan: See Appendix B. <br /> Responsible Staff: TBD <br /> Page 16 <br />