My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3625 8TH ST 2020-07-08
>
Address Records
>
8TH ST
>
3625
>
3625 8TH ST 2020-07-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2020 6:59:26 AM
Creation date
7/6/2020 8:12:36 AM
Metadata
Fields
Template:
Address Document
Street Name
8TH ST
Street Number
3625
Notes
WO 3591-02
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
525
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.1.4 Element 4: Install Sediment Controls <br /> BMPs including silt fence, catch basin protection, and existing Stormwater Quality Pond 2 will <br /> minimize sediment discharge from the site. <br /> Each phase of construction activity shall utilize these BMPs to direct all site runoff to collection <br /> points where runoff can be conveyed to the existing Stormwater Quality Pond 2 prior to <br /> discharge to existing outfalls. <br /> These elements will be upgraded if necessary to account for site conditions and rainfall. <br /> List and describe BMPs: C220—Storm Drain Inlet Protection, C233—Silt Fence, existing <br /> Stormwater Quality Pond 2 <br /> Installation Schedules: Prior to earthmoving activity and maintained throughout construction. <br /> Inspection and Maintenance plan: Wet Season: Weekly and after heavy rainfall, Dry Season: <br /> Monthly and after rainfall. See Appendix B. <br /> Responsible Staff: TBD <br /> Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.