Laserfiche WebLink
L. <br /> CERTIFICATE OF COMPLETION <br /> Project: Alverson Stormwater Separation Project <br /> Contractor: Rodarte Construction, Inc. <br /> Work Order No. UP3660 <br /> The above-mentioned project was constructed per the plans and specifications and <br /> to the satisfaction of the Public Works Department. <br /> The Contractor physically completed the project, within the time allowed in the <br /> contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> ulic Works Director Date <br /> Ryan Sass <br /> Approved by: <br /> Mayor, City of Everett Date <br /> Cassie Franklin <br /> Attest: <br /> City Clerk <br /> Sharon Fuller <br /> APPROVED AS TO FORM <br /> By: <br /> David C. Hall, City Attorney <br /> Date <br /> 33 <br />