My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020/07/01 Council Agenda Packet
>
Council Agenda Packets
>
2020
>
2020/07/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 9:10:29 AM
Creation date
7/6/2020 9:09:24 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/1/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L. <br /> CERTIFICATE OF COMPLETION <br /> Project: Alverson Stormwater Separation Project <br /> Contractor: Rodarte Construction, Inc. <br /> Work Order No. UP3660 <br /> The above-mentioned project was constructed per the plans and specifications and <br /> to the satisfaction of the Public Works Department. <br /> The Contractor physically completed the project, within the time allowed in the <br /> contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> ulic Works Director Date <br /> Ryan Sass <br /> Approved by: <br /> Mayor, City of Everett Date <br /> Cassie Franklin <br /> Attest: <br /> City Clerk <br /> Sharon Fuller <br /> APPROVED AS TO FORM <br /> By: <br /> David C. Hall, City Attorney <br /> Date <br /> 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.