My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020/07/01 Council Agenda Packet
>
Council Agenda Packets
>
2020
>
2020/07/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 9:10:29 AM
Creation date
7/6/2020 9:09:24 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/1/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Run Date: 1/31/2020 City of Everett-Public Works Department p Cutoff Date: 1/31/2020 <br /> Time: 9:49 AM <br /> Contract Estimate Voucher <br /> • Project: 367 For Work Order#3660 <br /> Estimate#9 Contractor: Rodarte Construction Inc <br /> ALVERSON STORMWATER 17 East Valley Hwy E <br /> SEPARATION PROJECT <br /> WO 3660 BID:$1,460,182.00 Auburn,WA 98092 <br /> TOTAL BID:$1,460,182.00 <br /> Unit Plan Total Previous Present Total Previous Present <br /> item# Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount <br /> 0026 CONCRETE DRIVEWAY RESTORATION SY 105.00 211.00 180.0000 180.0000 0.0000 18,900.00 18,900,00 <br /> 0027 CONCRETE CURB&GUTTER,TYPE A-1 LF 65,00 700.00 963.0000 953.0000 0.0000 61,945.00 61,945.00 0.00 <br /> 0028 CONCRETE CURB,TYPE E-1 0.00 <br /> LF 60.00 10.00 6,0000 6.0000 0.0000 360,00 360,00 0.00 <br /> 0029 ASPHALT WEDGE CURB LF 65.00 26.00 0,0000 0.0000 0.0000 0.00 <br /> 0.00 0.00 <br /> 0030 FORCE ACCOUNT FA 1.00 100,000.00 89,202,5400 89,202.5400 0.0000 89,202.54 89,202,54 0.00 <br /> Work Order Totals: 1,382,275.42 1,315,990,56 66,284.86 <br /> ca <br /> M <br /> 1 <br /> i <br /> d.lJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.