My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/05/20 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/05/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 9:40:48 AM
Creation date
7/6/2020 9:39:12 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/20/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Work <br /> Energy efficiency measures under Contract No. 2014-087 G(1-1) will include upgrades of street <br /> lighting, including any and all necessary ancillary equipment. The ESCO will perform a detailed <br /> engineering design as needed to obtain Owner review and approval of the proposed systems and to <br /> obtain bids as required. The ESCO will provide construction management, as-built drawings,and <br /> O&M manuals. All work is per the City of Everett's Energy Services Proposal dated March 21, <br /> 2014. <br /> • <br /> Schedule For Completion <br /> Final completion,including 1st year M&V,within 825 calendar days after Authorization to Proceed. <br /> 2014087Gagrtg <br /> • <br /> • <br /> • <br /> • <br /> Authorization No.2014-087 A(1) Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.