Laserfiche WebLink
Scope of Work <br /> Energy efficiency measures under Contract No. 2014-087 G(1-1) will include upgrades of street <br /> lighting, including any and all necessary ancillary equipment. The ESCO will perform a detailed <br /> engineering design as needed to obtain Owner review and approval of the proposed systems and to <br /> obtain bids as required. The ESCO will provide construction management, as-built drawings,and <br /> O&M manuals. All work is per the City of Everett's Energy Services Proposal dated March 21, <br /> 2014. <br /> • <br /> Schedule For Completion <br /> Final completion,including 1st year M&V,within 825 calendar days after Authorization to Proceed. <br /> 2014087Gagrtg <br /> • <br /> • <br /> • <br /> • <br /> Authorization No.2014-087 A(1) Page 2 of 2 <br />