My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/06/03 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/06/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 10:52:19 AM
Creation date
7/6/2020 10:45:24 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/3/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Jackson Park Playground Equipment,with installation,REV 5/11/15 KCDA <br /> QUOTE <br /> #60357 <br /> 05/11/2015 <br /> Qty Part# Description List$ °o Disc. Selling$ Ext. Selling$ <br /> 1 Mats Installer-Install Wear Mats in 8 $622.00 $622.00 <br /> locations- <br /> Approx 180 SF including 12x12' <br /> Hexagon Mat <br /> 1 Mark/Dig Installer-Mark and dig for excavation $960.00 $960.00 <br /> -Multiple locations, to tie into existing <br /> storm drain line <br /> 1 6143 Game Time-Whirlwind Seat Straight $593.00 2.00 $581.14 $581.14 <br /> (F/S) <br /> 1 6057 Game Time-Police Car Saddlemate $775.00 2.00 $759.50 $759.50 <br /> 1 6231 Game Time-G2 $3,476.00 2.00 $3,406.48 $3,406.48 <br /> 1 36060 Game Time-Creative Art Center $9,027.00 15.00 $7,672.95 $7,672.95 <br /> 1 18392 Game Time-3'Rumble&Roll Zip $3,720.00 15.00 $3,162.00 $3,162.00 <br /> Slide,F/S <br /> -Includes WA Prevailing Wages and filings. SubTotal: $153,420.08 <br /> -Performance and Payment Bond included Discount: ($8,532.91) <br /> -ALL Products bid carry current IPEMA Certification Tax: $14,282.28 <br /> -Installation is by GameTime Certified Installer with current NPSI Freight: $10,354.97 <br /> Certificate Total Amount: $169,524.42 <br /> .PEA GRAVEL NOT PROVIDED OR INSTALLED.Pea gravel must <br /> install After the equipment. <br /> EXCLUSIONS and CONDITIONS: <br /> -Pea gravel must be installed AFTER equipment installation or extra <br /> charges will incur. <br /> -Buried concrete,trash,stumps or subsurface obstructions are not to be <br /> expected and will incur additional labor costs at$66/hr/laborer,plus <br /> equipment costs,if encountered. <br /> -Replacement labor warrantee shall not exceed manufacturers product <br /> warrantee periods. <br /> -Finish grading for drainage(by others)shall occur AFTER play <br /> equipment installation. <br /> -Jobsite Security fencing is NOT included. <br /> -Includes Disposal of all playground related trash. <br /> PLAYGROUND EQUIPMENT AND INSTALLATION TO BE <br /> PER D Senator H.M.Jackson Park DRAWING DATED 5/8/15 <br /> All Prices shown are at or below the KCDA Contract prices,and <br /> comply with the terms of the KCDA Cooperative purchasing <br /> requirements. <br /> SiteLines Park&Playground Products,Inc. <br /> Page 2 of 4 <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.