Laserfiche WebLink
• <br /> EXHIBIT B <br /> GEOENGINEERS FEE ESTIMATE <br /> • <br /> Geotechnical,Hydrologic,and Biologic Services <br /> Job Number: 681-100-04 Job Name: Lake Chaplain Roadway and Culvert Evaluation owner. City of Everett <br /> Client: City of Everett Prepared: Debra Overbay/Jon Ambrose <br /> Billing Rates 7 $234 $212 $200 $169 $142 $126 $109 $159 $105 $82 $71 <br /> Senior Staff III Staff it Expenses and <br /> Engineer/A Project Engineer/ Engineer/ Staff I GIS CAD Subcontracted <br /> Task Task Description Principal Associate nelyst Engineer Scientist Scientist Engineer Analyst Designer Admin 2 Admin 1 Drilling Total Hours Total Labor Total Cost <br /> Geotechnical Engineering 82 9 $1,368 $1,460 <br /> 1 Review Existing Information <br /> 1 2 4 2 <br /> 185 0 $1,416 1,G <br /> 2 Geologic Reconnaissance and Locale Explorations 4 <br /> 2 1 4983 12 ;1,366 ;6,300 <br /> 3 Field Exploration Program(Drilling) I 6 853 2 $284 $937 <br /> 4 Laboratory Analyses 2 <br /> 5 Embankment Stability Analyses 2 8 2 102 12 $1,702 $1,804 <br /> G Evaluate Seepage/Piping Potential 1 2 • 6 _ 2 99 11 $1,652 $1,761 <br /> • <br /> Hydrologic/Biologic Tasks <br /> 1 Silo Assessment: Geomorphic Assessment and Fish Passage Evaluation <br /> 10 10 2 322 22 $3,704 $4,026 <br /> Project Permitting Assessment • <br /> 1 !denary permit pathway,design thresholds,fish pasage criteria <br /> 5 12 185 17 $3,0311 $3,273 <br /> r•a <br /> cn • <br /> Conceptual Design Tasks and Reporting <br /> 1 Develop Two Conceptual Design Alternatives 1 14 20 4 16 4 513 59 $8,664 $9,06 <br /> 12 173 16 ;2,0T0 $3,049 <br /> 2 Provide 15%Quantllily and Cost Estimates 4 <br /> 3 Technical Memo and Plan Schematics Preparation <br /> 1 8 14 e 4 2 6 4 393 47 $6,548 $6,941 <br /> Meolincds and Project Management 8 6 147 14 $2,462 $2,699 <br /> Total Labor l 4 59 0 24 69 26 0 4 18 14 11 7838 229 $35,029 $42;167 <br /> • <br /> Expense Broakdowri <br /> Unit costs/Expense 2,102 <br /> • <br /> Field Equipment/Mileage 300 <br /> , <br /> Gubconiracled Drilling 4,800 <br /> Laboratory Analyses 630 <br /> Total Expenses 7838 <br /> Total Fee Estimate $42,867 <br /> ,s <br /> ice.► <br /> rr <br />