My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/06/03 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/06/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 10:52:19 AM
Creation date
7/6/2020 10:45:24 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/3/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Background: Three Elements of a Difficult Problem <br /> 0 <br /> ELEMENT TWO: COMBINED SYSTEM <br /> • The City's combined sewer system was first <br /> constructed between 1897 and 1963. Like about boo <br /> other communities in the United States, Everett must <br /> contend with this historical legacy. <br /> • Combined system is generally north of 41St Street <br /> • Less than half of Everett ratepayers live in the <br /> combined system area <br /> • The combined system contains about 2,785 manholes <br /> and 145 miles of 2- to 84-inch diameter pipelines. <br /> • System works as designed <br />
The URL can be used to link to this page
Your browser does not support the video tag.