My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/06/17 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/06/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 11:33:54 AM
Creation date
7/6/2020 11:27:55 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/17/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FJI3EF. <br /> Henry M .Jackson Park Renovation RFCOP 20'15-03-30 C <br /> 17582 <br /> Monday,June 01,2015 Bid Line <br /> What are we installing Unit Totaled <br /> MOBILIZATION 1-09.7 $ 4,296.76 <br /> 20045 Force Account Concrete&Over ex $ 17,854.22 <br /> 20046 Force account Contaminated Clean up $ 22,406.96 <br /> Labor and Materials needed to replace the existing 2" PVC potable water line with HDPE pipe from the double check at the north parking lot to the new service line foi $ 7,183.16 <br /> Labor and Material to install water service from the west restroom to MDF drinking fountain $ 1,902.17 <br /> Labor and Material to install 3 shut off valves and box's for the water services to the restrooms and drinking fountain $ 4,449.67 <br /> Labor and Material needed to excavate the playground area an additional 4"below current design grade. $ 4,745.11 <br /> Delete 4" Perforated drain line, Fittings,and Cleanouts for Playground $ (2,137.16) <br /> Labor and Material to install 4"of Pea Gravel in the play ground area. Pea Gravel to be Installed after the playground support structures and drain pipe In item 2 are in: $ 11,266.58 <br /> Provide and intall geo fabric over the pea gravel $ <br /> Labor and material to modify grading plans and storm drain plans as shown on sheet C3.0,C3.1,C4.0 and C5.0 Revision 4. $ 5,123.07 <br /> Clarification:Storm Structure 16(sheet 4.0)-Min.size 12"X12"NDS with Cast iron locking lid.See section 334000 in the contract specs.Discuss with owner prior to int $ - <br /> Catch basins for yard hydrants drains shall be the same or an approved equal as structure 16 $ 4,251.24 <br /> Structural Shop Drawings Review for Restroom's&Garden building $ 1,238.40 <br /> 2'Wide Pervious Vehicular Concrete around New Shelter $ 5,816.31 <br /> -.420044 Force Account Public Works Portion of 20045 <br /> .,� _.-- _,< +Totals <br /> .._ ,',.,..,—,. ' .,;r-,... '''''.,.•wx'-*^sue'— '-''."'R 0?36 <br /> L71 <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.