My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/09/24 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/09/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 8:44:13 PM
Creation date
7/6/2020 1:04:06 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/24/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br />FINAL CONTRACT VOUCHER CERTIFICATION <br />CONTRACTOR:Valley Electric of Mt. Vernon <br />CITY: Everett STATE: WA 98203 <br />PROJECT TITLE: Merrill Creek Signals <br />DATE WORK COMPLETE: June 23, 2008 <br />ADDRESS: 1100 Merrill Creek Parkway <br />DATE: August 26, 2008 <br />WORK ORDER NO. PW3272 <br />FINAL AMOUNT: $ 534,581.93 <br />CONTRACTOR'S CERTIFICATION <br />I, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work performed <br />and material furnished to the City of Everett, that the same or any part thereof has not been paid, and that I am <br />authorized to sign for the claimant; that I have not rented or purchased any equipment or materials from any <br />employee of the City; I further certify that the attached final estimate is a true and correct statement showing all the <br />monies due me from the City of Everett under this contract; that I have carefully examined said final estimate and <br />understand the same and that I hereby release the City of Everett from any and all claims of whatsoever nature <br />which I may have, arising out of the performance of said contract, which are not set forth in said estimate. <br />X <br />X Robert D. Carrithers, C.F.O. <br />CONTRACTOR TITLE <br />Valley Electric of Mt. Vernon <br />Subscribed and sworn to before <br />me tlyiday of <br />c2 <br />h Notary Public <br />in and fo the State f W shington, residing at L ,/ <br />PUBLIC WORKS DEPARTMENT CERTIFICATION <br />I Certify the attached final APPROVED <br />estimate to be based upon actual <br />measurements and to be true and correct. <br />X_�a1e <br />Construction Manager Utilities Director <br />Tom Fuchs Tom Thetford <br />Date: <br />X <br />INSTRUCTIONS <br />The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br />agents and forwarded with the Final Contract Voucher Certification. <br />Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br />attached. <br />Revised 9/94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.