My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/09/24 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/09/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 8:44:13 PM
Creation date
7/6/2020 1:04:06 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/24/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Final Acceptance & Certification of Consent COUNCIL BILL # <br />A <br />Completion with Rinker Material dba X Action Originating Department Public Works <br />Cemex for the 2007 Hot Mix Asphalt First Reading Contact Person Tom Fuchs <br />Overlay Project. Second Reading Phone Number <br />Third Reading FOR AGENDA OF <br />Public Hearing <br />Initialed by: <br />Department Head <br />CAA <br />Council President <br />Location Preceding Action Attachments <br />Various streets in the City Bid: 07/03/2007 Final Contract Voucher Public Works <br />of Everett. Award: 07/18/2007 Certification, Certificate of <br />Budget Committee: Completion, Final Estimate <br />425-257-8931 <br />Sept. 24, 2008 <br />10/24/2007 <br />Change Order #1: <br />10/30/2007 <br />Department(s) Approval <br />Amount Budgeted <br />$ 1,871,196.11 <br />Expenditure Required <br />$ 0 <br />Account Number(s): PW3291 <br />Budget Remaining <br />$111,238.08 <br />Additional Required <br />$ 0 <br />DETAILED SUMMARY STATEMENT: <br />The general contractor, Rinker Materials dba Cemex., completed the 2007 Hot Mix Asphalt Overlay project in <br />accordance with the plans and specifications and to the satisfaction of the Public Works Department. <br />The amounts paid the contractor under this contract are as follows: <br />Amount paid to date is $1,759,958.03. The contractor put up a Retainage Bond in Lieu of retainage being withheld. <br />By Council approving this action, the 2007 Hot Mix Asphalt project will be accepted as complete and the retainage <br />bond will be released. <br />RECOMMENDATION (Exact action requested of Council): <br />Accept 2007 Hot Mix Asphalt Overlay Project as complete and authorize the Mayor to sign the Certificate of <br />Completion with Rinker Materials dba Cemex allowing release of the retainage bond. <br />
The URL can be used to link to this page
Your browser does not support the video tag.