Laserfiche WebLink
CITY OF EVERETT 2021 To 2026 Six-year Transportation Improvement Program <br /> Interstate Local Access and Other Projects (continued) <br /> 1. I-5 /Downtown Everett Interchange Access Improvements 1. Bridge Rehabilitation Program (Maintenance) <br /> (Everett Ave.Hewitt Ave.,US 2,Pacific Ave) 2. Annual Pavement Maintenance Program (Maintenance) <br /> 2. I-5 / 100th Street SE HOV Access/Undercrossing 3. Sidewalk repair and replacement (Maintenance) <br /> 3. NB Everett Mall Way/SB I-5 Onramp 4. Pavement marking projects (Maintenance) <br /> 4. I-5/Smith Island Interchange(I-5&SR 529) 1. 106th Place SE Improvements (Street) <br /> 5. I-5 /East Marine View Drive Interchange Improvements 2. 3rd Avenue SE Improvements (Street) <br /> 6. I-5 NB Shoulder Running(US 2 to SR 528) 3. Local Street Improvements (Street) <br /> 7. I-5 / 128th Street Interchange 4. Upper&Lower Ridge Rd.Improvements (Street) <br /> 8. I-5 / 128th Street HOV Ramps(Mariner Park&Ride) 5. Riverfront Site Access Improvements (Street) <br /> 9. I-5 / 112th Street Interchange Study 6. Downtown Streetscape Improvements (Street) <br /> 1. Traffic Signal Central System (Traffic Signals) <br /> Freeways 2. Traffic Signal Interconnect (Traffic Signals) <br /> 1. US 2 Improvements(SR 204 to I-5) 3. Traffic Signal Improvements (Traffic Signals) <br /> 2. SR 526 Corridor/Hardeson Road Interchange 4. ffraffic Sign Improvements (Traffic Signals) <br /> 3. SR 526 Extension(I-5 to US 2) 1. Neighborhood Block Grants (Neighborhoods) <br /> 4. SR 526/Evergreen Way Interchange 2. Neighborhood Traffic Studies/Project (Neighborhoods) <br /> 5. SR 529/Smith Island Ramps 3. Residential Sidewalks (Neighborhoods) <br /> 6. SR 526/40th Avenue W. Intersection Improvements <br /> Non-Motorized Trail/Path Improvements <br /> Principal Arterials 1. Smith Island Bike and Pedestrian Improvements <br /> 1. W.Marine View Dr./Rucker/41st Freight Route Improvements 2. Bicycle Master Plan Implementation <br /> 2. Broadway Corridor Improvements (SR 526 to SR 529) 3. Fleming St.Bicycle Corridor <br /> 3. SE Everett Mall Way(SR 99 to SR 526) 4. Riverside Bus Pk.Ped.Trail(16th to N.Broadway) <br /> 4. Arterial Safety Projects 5. West/East Marine View Drive Bike-Ped Improvements <br /> 5. Evergreen Way Improvements (41"St.to Gibson Road) 6. 47th Street Ped Improvements (Evergreen to Black Forest Lane) <br /> 6. Evergreen Way Streetscape Improvements 7. Pigeon Creek No. 1/BNSF Rail Line Crossing <br /> 7. I-5 to Port of Everett Truck Route 8. Grand Avenue/North Marina Ped-Bike Connection <br /> 8. Mukilteo Blvd.Safety Imp. (Friday Ave. to City Limits) 9. Shoreline Access Imp. (Various Locations) <br /> 9. Arterial Needs Study 10. Pigeon Creek Rd.No. 1 Improvements <br /> 10. Edgewater Creek Bridge Replacement 11. Everett Non-motorized Projects (Various Locations in Everett) <br /> 11. Maple Heights Bridge Seismic Retrofit 12. Lowell Snohomish River Road.Bike/Ped Connection <br /> 13. Riverfront District Bike/Ped Paths <br /> Minor Arterials 14. Interurban Trail Bike/Ped Path Improvements <br /> 1. 116th Street SE Street Improvements (SR 527 to 35th) 15. Bicycle Detection Signals <br /> 2. 100th Street SW Street Improvements (4th Ave.W.to Airport) 16. ADA Signals (Accessible Pedestrian Signals (APS)) <br /> 3. Casino Rd.Safety Improvements (Evergreen to 5th Ave.) 17. ADA Ramps <br /> 4. 4th Avenue West Improvements (104th to 112th) 18. Waterfront Place Esplanade <br /> 5. 100th Street SE Improvements (SR 527 to 7th Ave SE) <br /> 6. 100th Street SE Improvements (7th Ave to Evergreen) Transit <br /> 7. 110th Street SE Improvements (SR 527 to 35th St.) 1. Bus Replacements-2018 to 2023 <br /> 8. Lenora St./Lowell-River Rd./BNSF Rail Line Xing 2. Implementation of State CTR Law <br /> 9. Minor Arterial Streetscape Improvements 3. Passenger Amenities (Shelters) <br /> 4. Everett Station Repair and Updates <br /> Collector Arterials 5. Operation Base Relocation and Construction <br /> 1. East Everett Avenue/BNSF Overcrossing 6. Broadway Corridor Improvements <br /> 2. Bond Street Ped/Bike Improvements. (Kromer to Terminal) 7. Safety and Security Enhancements <br /> 3. Chestnut St. /Eclipse Mill Road. Improvements (Pacific to 36th) 8. On Board ITS replacement&upgrade <br /> 4. Silver Lake Road-121 st Street SE Ped. Improvements 9. Service Planning&Development Software/Hardware <br /> 5. 37th Street Improvements (Rucker to Broadway) 10. Next Generation ORCA Project <br /> 6. Collector Arterial Streetscape Improvements 11. Next Generation ORCA Project Cost Share w/Region <br /> 12. Waterfront/Riverfront Connector Service <br /> High Capacity Transit 13. 80 Stall Park and Ride <br /> 1. Light Rail-Lynnwood to Everett Extension <br /> 2. Light Rail Stations Port-Marine Industrial Transportation Improvements <br /> 3. HCT Support Program 1. Marine Terminals Maintenance and Expansion <br /> 2. Marine Terminals: South Terminal Modernization Project <br /> Local Access and Other Projects 3. Harbor and Snohomish River Federal Navigation Channel <br /> 1. BNSF RR safety improvements (Safety) Improvements <br /> 2. Local roadway safety projects (Safety) 4. SR 529 (W.Marine View Drive)Bulkhead Rehabilitation <br /> 3. Safe routes to schools (Safety) <br /> Projects in bold type not included in 2020-2025 TIP 1 <br />