My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 7531
>
Resolutions
>
Resolution 7531
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2020 10:02:48 AM
Creation date
7/8/2020 10:01:16 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
7531
Date
6/24/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT 2021 TO 2026 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM <br /> PROJECT PROJECT PROJECT ESTIMATED LEAD <br /> TYPE NAME LOCATION COST AGENCY <br /> Transit Projects Bus Replacements 2020 -Approx. 18 PT Buses $1,400,000 Everett Transit <br /> Transit Projects Bus Replacements 2022 -Approx. 11 HD Buses $10,500,000 Everett Transit <br /> Transit Projects Implementation of State CTR Law $300,000 Everett Transit <br /> Transit Projects Everett Station Repair and Updates Everett Station $1,000,000 Everett Transit <br /> Transit Projects Operations Base Relocation and Construction $30,000,000 Everett Transit <br /> Transit Projects Broadway Corridor Improvements Broadway Ave. $3,000,000 Everett Transit <br /> Transit Projects Safety and Security Enhancements $500,000_Everett Transit <br /> Transit Projects On Board ITS replacement& upgrade Operations $1,500,000 Everett Transit <br /> Transit Projects Service Planning & Development Software/Hardware Everett Station $200,000 Everett Transit <br /> Transit Projects Next Generation ORCA Project Cost Share w/region Regional $1,016,000 Everett Transit <br /> Transit Projects Next Generation ORCA Hardware/Installation Operations $749,000 Everett Transit <br /> Transit Projects Waterfront/Riverfront Connector Service Operations $3,600,000 Everett Transit <br /> Transit Projects 80 Stall Park and Ride Operations $750,000 Everett Transit <br /> $54,515,000 <br /> NOTE: Projects shown in bold type (if any)were not included in the 2020-2025 Six-Year TIP. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.