Laserfiche WebLink
elec-3.pdf <br /> (4) CB 2006-39 - 3rd and final Reading - Adopt the Proposed Ordinance amending <br /> Ordinance No. 3661-19 entitled, "Everett Fire Administration Building Tenant <br /> Improvements Project', Fund 342, Program 027, to accumulate the design and <br /> construction costs for the Project in the amount of$1,600,000.00. <br /> Documents: <br /> CB2006-39.pdf <br /> (5)Award the construction contract for the Everett Fire Administration Building Tenant <br /> Improvements Project to Kirtley-Cole Associates, LLC. in the amount of$1,079,334.00. <br /> Documents: <br /> Kirtley Cole.pdf <br /> (6)Adopt Resolution superseding Resolution No. 7493 and setting August 5, 2020, at <br /> 6:30 p.m. as the date and time to hear and determine the petition for the proposed <br /> vacation of the north-south alley together with the southern east-west alley in the 2900 <br /> Block lying between Pine Street and Maple Street. (Public hearing on 8-5-20). <br /> Documents: <br /> Pine Street-1.pdf <br /> (7)Award and authorize the Mayor to sign contracts resulting from Request for Proposal <br /> #2019-103 for concession services to Dog Day Afternoon, Fun Times Ice Cream, and Lil <br /> Puddle for two years with three (3) one-year extension options. <br /> Documents: <br /> Dog Day.pdf <br /> (8)Authorize the Mayor to accept$11,700 in grant funding from Snohomish County Historic <br /> Preservation Commission to digitize historic panoramic photos. <br /> Documents: <br /> Historic Preservation.pdf <br /> (9)Authorize the Mayor to sign Amendment No. 1 to the Professional Services <br /> Agreement with CHS Engineers and David Evans and Associates, Inc. to design a new <br /> sewer lift station near Edgewater Park and a new forcemain pipe along Shore Avenue. <br /> Documents: <br /> David Evans.pdf <br /> (10)Authorize the Mayor to sign the Professional Services Agreement with Brown & <br /> Caldwell for Owner Advisor services related to procurement of a Progressive Design- <br /> Build contractor for Reservoir 3 structural repairs. <br /> Documents: <br /> Brown and Caldwell-1.pdf <br />