Laserfiche WebLink
8/23/2019 Page 1 <br /> City of Everett <br /> 11:23:52AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1607-013 Site Address 4314 29TH DR SE LOT 116 <br /> Applied 7/11/2016 Applicant POLYGON WLH LLC Lot <br /> Approved 7/19/2016 Owner CDCG 3 WLH LP Block <br /> Issued 7/20/2016 Contractor POLYGON WLH LLC Tract <br /> Parent Permit No. RB1502-009 Description NEW SFR BASIC/2015 IRC-RB1502-009 <br /> Notes PLAN#2645A <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 8/12/2016 8/12/2016 UFER Ground KMK Approval <br /> 8/25/2016 8/25/2016 RoofDrain RDA Corr Reqd Unable to inspect, <br /> already backfilled <br /> 9/1/2016 9/1/2016 Underfloor KMK Approval See notes Underfloor framing <br /> OK to cover <br /> Note:see special inspection report for <br /> foundation <br /> 9/26/2016 9/26/2016 ShearNailing KMK Approval Ok to side <br /> 10/4/2016 10/4/2016 GasPiping DXW Approval Rough in pas pipe 17 <br /> PSI OK <br /> 10/5/2016 10/5/2016 MechRoughIn DXW Approval <br /> 10/10/2016 10/10/2016 Framing KMK PartialApproval See notes Framing OK pending rough in plumbing <br /> Note-Do not insulate until completed <br /> 10/10/2016 10/10/2016 UFER Ground KMK Approval See special <br /> inspection report <br /> 10/10/2016 10/10/2016 Footing KMK Approval See special <br /> inspection report <br /> 10/10/2016 10/10/2016 Foundation KMK Approval See special <br /> inspection report <br /> 10/11/2016 10/11/2016 PlbgRoughln DXW Corr Reqd Rough in not <br /> complete <br /> 10/12/2016 10/12/2016 PlbgRoughln DXW Approval <br /> 10/13/2016 12/12/2018 InsulBldg KMK Unable to inspect, 11:40 a.m. <br /> see notes 1)No plans or permit. <br /> 2)Work not completed. <br /> 3)Be sure Plumbing correction is <br /> completed before re-call. <br /> 10/14/2016 10/14/2016 InsulBldg KMK Approval OK to sheet rock <br /> 10/18/2016 10/18/2016 DrywallNailing KMK Approval OK to mud&tape <br /> 12/5/2016 12/5/2016 GasPipeFinal SDP Approval <br /> 12/5/2016 12/5/2016 Final Mech SDP Approval <br /> 12/5/2016 12/5/2016 Final Plbg SDP Corr Reqd See notes Plumbing Final not OK. <br /> 1)Temperature&pressure drain is back <br /> graded. <br /> 12/6/2016 12/6/2016 Final Plbg SDP Approval OK Final plumbing <br /> 12/6/2016 12/6/2016 Final Bldg KMK APPROVAL As noted 1)Obtain Plumbind final <br /> 2)Obtain Public works final. <br /> Note:Received energy compliance <br /> certificate. <br /> [Plumbing was finaled 12-6-16] <br /> 8/22/2019 8/22/2019 CERTIFICATE OF TAH APPROVAL CO ISSUED <br /> OCCUPANCY <br /> INSP12 CI?WSYar1,M S <br />