My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3014 46TH PL SE 2020-07-13
>
Address Records
>
46TH PL SE
>
3014
>
3014 46TH PL SE 2020-07-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2020 2:28:53 PM
Creation date
7/13/2020 2:28:37 PM
Metadata
Fields
Template:
Address Document
Street Name
46TH PL SE
Street Number
3014
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLI-WORKS PERMIT Date Applied: -12/12/2018 <br /> City of Everett Permit Services Public Works Permit#: PW1812-026 <br /> jilf! <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: C1810-008 <br /> Everett,WA 98201 Planning Reference#: SUB14-002 <br /> (425)257-8810 Public Works Fee: $65.00 <br /> 4 JAN 2019 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> POLYGON WLH LLC PANI ALAN <br /> 11624 SE 5TH ST SUITE 100 <br /> BELLEVUE, WA, 98005 <br /> PHONE: 4255867700 PHONE: <br /> TAX PARCEL ID#: SITE ADDRESS: 3014 46TH PL SE <br /> DESCRIPTION: NEW SFR-LOT 38 <br /> PLAN #3581C <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 5. All inspections (including job start consultation prior to starting construction) must be formally requested through the <br /> Online Permitting Portal at https://pw.everettwa.gov. Contact the City of Everett Public Works Inspector Randy Allen at 425- <br /> 339-7403 with any questions. <br /> 6. Install any erosion control measures as determined by the Public Works Inspector per City of Everett Standards, such as <br /> silt fence, straw bales, swales, or erosion blankets. <br /> 7. Connect side sewer per City Standard#'s 601 through 604. <br /> 8. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 9. No building materials to be stacked on sidewalk/roadway and sidewalk/roadway to be kept clean and open for pedestrian <br /> travel. 19 <br /> 10. Public Works Construction shall be done per approved plan dated 12/x{/2018. (Approved Site Plan attached) <br /> 11. Construct foundation only until Plat is final and recorded. <br /> Public Works Permit Fee Breakdown: <br /> PW Plan Review $20.00 <br /> III 8 <br /> PW Site Inspection $20.00 <br /> Driveway $25.00 <br /> JAN - 42019 <br /> CITY OF <br /> Permit��ERETT <br /> ces <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> / harmless the City of Everett from any and all claims for damages,costs, <br /> 1 /2/( /¢ expenses,or causes of action that may arise because of installation and <br /> ( (( O maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> FINAL INSPECTION Date 1 Is h•5 <br /> Approved as Constructed (PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.