My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3018 46TH PL SE 2020-07-13
>
Address Records
>
46TH PL SE
>
3018
>
3018 46TH PL SE 2020-07-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2020 2:46:19 PM
Creation date
7/13/2020 2:45:56 PM
Metadata
Fields
Template:
Address Document
Street Name
46TH PL SE
Street Number
3018
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7/25/2019 (P-ageCity of Everett <br /> 2:32:46PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1810-006 Site Address 3018 46TH PL SE <br /> Applied 10/12/2018 Applicant PANI ALAN Lot <br /> Approved 12/13/2018 Owner POLYGON WLH LLC Block <br /> Issued 1/4/2019 Contractor POLYGON WLH LLC Tract <br /> Parent Permit No. RB1810-002 Description NEW SFR-2015 IRC-RB1810-002 <br /> Notes PLAN#3581A <br /> other plumbing=water service line(behind meter)3/4" <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 2/25/2019 2/25/2019 BLDG KMK APPROVAL (2/25/2019 2:47 PM KMK) <br /> 02-FOOTING/SETB See special inspection report. <br /> 2/25/2019 2/25/2019 BLDG KMK APPROVAL (2/25/2019 2:47 PM KMK) <br /> 03-FOUNDATION See special inspection report. <br /> 2/25/2019 2/25/2019 BLDG KMK APPROVAL 425-466-8977 Dan <br /> 05-UNDERFLOOR <br /> 2/25/2019 2/25/2019 BLDG 04-UFER KMK APPROVAL (2/25/2019 2:47 PM KMK) <br /> GROUND See special inspection report. <br /> 3/21/2019 3/21/2019 BLDG KMK APPROVAL <br /> 10-INTERIOR <br /> 3/25/2019 3/25/2019 MECH 04-ROUGH DXW PARTIAL APPR F/P exh.R.I.ok <br /> IN <br /> 3/25/2019 3/25/2019 GAS 01-ROUGH IN DXW NOT READY <br /> 3/28/2019 3/28/2019 MECH 04-ROUGH SDP APPROVAL <br /> IN <br /> 3/28/2019 3/28/2019 PLUMB SDP APPROVAL <br /> 03-ROUGH IN <br /> 3/28/2019 3/28/2019 GAS 01-ROUGH IN SDP APPROVAL (3/28/2019 2:47 PM SDP) <br /> 20#test. <br /> 4/2/2019 4/2/2019 BLDG TMB APPROVAL As Noted (4/2/2019 12:48 PM TMB) <br /> 08-FRAMING North East Bedroom Smoke Alarm is not <br /> Wired or Connected. <br /> Ok to Insulate only after Electrical Roughin <br /> Approval has been Recieved. <br /> *** See Electrical Inspection Report <br /> **** <br /> 4/4/2019 4/4/2019 BLDG KMK APPROVAL <br /> 11-INSULATION <br /> 4/9/2019 4/9/2019 BLDG KMK APPROVAL <br /> 09-DRYWALL <br /> 7/17/2019 7/17/2019 PLUMB 06-FINAL DXW APPROVAL eTRAKiT Inspection 7/16/2019 3:03 PM Joshua Edwards <br /> Request <br /> Contact Name:Joshua Edwards <br /> Site Address:3018 46TH PL SE <br /> Phone:2063270830 <br /> e-Mail:jumpman3b@gmail.com <br /> 7/17/2019 7/17/2019 GAS 03-FINAL DXW APPROVAL eTRAKiT Inspection 7/16/2019 3:03 PM Joshua Edwards <br /> Request <br /> Contact Name:Joshua Edwards <br /> Site Address:3018 46TH PL SE <br /> Phone:2063270830 <br /> e-Mail:jumpman3b@gmail.com <br /> 7/17/2019 7/17/2019 MECH 06-FINAL DXW APPROVAL eTRAKiT Inspection 7/16/2019 3:03 PM Joshua Edwards <br /> Request <br /> Contact Name:Joshua Edwards <br /> Site Address:3018 46TH PL SE <br /> Phone:2063270830 <br /> e-Mail:jumpman3b@gmail.com <br /> INSP12 CRWS YS TEM S <br />
The URL can be used to link to this page
Your browser does not support the video tag.