My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 W MARINE VIEW DR SEINER WHARF 2020-07-14
>
Address Records
>
W MARINE VIEW DR
>
1500
>
SEINER WHARF
>
1500 W MARINE VIEW DR SEINER WHARF 2020-07-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2020 11:40:08 AM
Creation date
7/14/2020 11:32:05 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1500
Tenant Name
SEINER WHARF
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/27/2019 Page 1 <br /> City of Everett <br /> 2:14:00PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. El 610-026 Site Address 1400. 1500 W MARINE VIEW DR <br /> Applied 10/6/2016 Applicant PORT OF EVERETT Lot <br /> Approved 10/6/2016 Owner PORT OF EVERETT Block <br /> Issued 10/7/2016 Contractor DALTON ELECTRIC Tract <br /> Parent Permit No. B1607-002 Description PACIFIC RIM PLATFORM,SEINER WHARF DEMO&REPLAC <br /> Notes *SPRINKLERS REQUIRED ON SEINER WHARF SEGMENT*INCLUDES DEMO& <br /> RECONSTRUCION OF SEGMENT D BULKHEAD AND SEINER WHARF. <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 3/20/2017 3/20/2017 ElecSlab/Conduit SKB PartialApproval See notes 2 sleaves and 1 stab up at new seiner war F <br /> southwest corner <br /> 3/22/2017 3/22/2017 ElecGrdWork SKB PartialApproval See notes OK groundwork power and corn duct bank <br /> northeast side of bulkhead between hand <br /> holes up to center set of HH <br /> 3/27/2017 3/27/2017 ElecGrdWork MCB Approval OK conduits <br /> groundwork <br /> 3/29/2017 3/29/2017 ElecGrdWork MCB Approval OK groundwork for <br /> vaults <br /> 3/30/2017 3/30/2017 ElecGrdWork MCB Approval <br /> 4/6/2017 4/6/2017 ElecGrdWork MCB Approval <br /> 5/9/2017 5/9/2017 Final Elec SKB Corr Reqd See notes Provide the AIC at the service and cable the <br /> service with the available protection for the <br /> bollard lights on the dock <br /> Install WR wet rated receptacles on all <br /> bollards <br /> Provide physical protection for the service <br /> gear <br /> 6/5/2017 6/5/2017 Mark Final** MCB Approval <br /> 6/5/2017 6/5/2017 Final Elec MCB Approval <br /> INSP12 antVSYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.