Laserfiche WebLink
Soil Management Plan <br /> The project intends to strip the existing organic topsoil. Where possible, this organic material will be used <br /> for landscaped areas. The balance will be hauled to an approved disposal location. The weather till <br /> beneath will be protected in locations where LID facilities are proposed. The structural fill and free- <br /> draining materials beneath LID facilities will be stockpiled on site as necessary. A Soil Management Form <br /> is attached on the following page. The entire disturbed area is area 'A'. <br /> • <br /> Pinehurst Ave. Duplex <br /> Drainage Report <br />