My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2219 PINEHURST AVE BASE FILE 2020-07-14
>
Address Records
>
PINEHURST AVE
>
2219
>
BASE FILE
>
2219 PINEHURST AVE BASE FILE 2020-07-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2020 4:05:40 PM
Creation date
7/14/2020 4:03:31 PM
Metadata
Fields
Template:
Address Document
Street Name
PINEHURST AVE
Street Number
2219
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contents <br /> 1.0 Introduction 1 <br /> 2.0 Site Description 5 <br /> 2.1 Existing Conditions 5 <br /> 2.2 Proposed Construction Activities 5 <br /> 3.0 Construction Stormwater BMPs 6 <br /> 3.1 The 12 BMP Elements 6 <br /> 3.1.1 Element#1 — Mark Clearing Limits 6 <br /> 3.1.2 Element#2 — Establish Construction Access 6 <br /> 3.1.3 Element#3 — Control Flow Rates 7 <br /> 3.1.4 Element#4 — Install Sediment Controls 7 <br /> 3.1.5 Element#5 — Stabilize Soils 9 <br /> 3.1.6 Element#6 — Protect Slopes 9 <br /> 3.1.7 Element#7 — Protect Drain Inlets 10 <br /> 3.1.8 Element#8 — Stabilize Channels and Outlets 11 <br /> 3.1.9 Element#9 — Control Pollutants 11 <br /> 3.1.10 Element#10 — Control Dewatering 12 <br /> 3.1.11 Element#11 — Maintain BMPs 12 <br /> 3.1.12 Element#12 — Manage the Project 12 <br /> 3.1.13 Element#13 — Protect On-Site Stormwater Management BMP's <br /> for runoff from roofs and other surfaces 12 <br /> 3.2 Site Specific BMPs 16 <br /> 3.3 Additional Advanced BMPs 16 <br /> 4.0 Construction Phasing and BMP Implementation 17 <br /> 5.0 Pollution Prevention Team 19 <br /> 5.1 Roles and Responsibilities 19 <br /> 5.2 Team Members 20 <br /> 6.0 Site Inspections and Monitoring 21 <br /> 6.1 Site Inspection 21 <br /> 6.1.1 Site Inspection Frequency 21 <br /> 6.1.2 Site Inspection Documentation 21 <br /> 6.2 Stormwater Quality Monitoring 22 <br /> 6.2.1 Turbidity 22 <br /> 6.2.2 pH 23 <br /> 7.0 Reporting and Recordkeeping 25 <br /> 7.1 Recordkeeping 25 <br /> 7.1.1 Site Log Book 25 <br /> 7.1.2 Records Retention 25 <br /> ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.