Laserfiche WebLink
Contents <br /> 1.0 Introduction 1 <br /> 2.0 Site Description 5 <br /> 2.1 Existing Conditions 5 <br /> 2.2 Proposed Construction Activities 5 <br /> 3.0 Construction Stormwater BMPs 6 <br /> 3.1 The 12 BMP Elements 6 <br /> 3.1.1 Element#1 — Mark Clearing Limits 6 <br /> 3.1.2 Element#2 — Establish Construction Access 6 <br /> 3.1.3 Element#3 — Control Flow Rates 7 <br /> 3.1.4 Element#4 — Install Sediment Controls 7 <br /> 3.1.5 Element#5 — Stabilize Soils 9 <br /> 3.1.6 Element#6 — Protect Slopes 9 <br /> 3.1.7 Element#7 — Protect Drain Inlets 10 <br /> 3.1.8 Element#8 — Stabilize Channels and Outlets 11 <br /> 3.1.9 Element#9 — Control Pollutants 11 <br /> 3.1.10 Element#10 — Control Dewatering 12 <br /> 3.1.11 Element#11 — Maintain BMPs 12 <br /> 3.1.12 Element#12 — Manage the Project 12 <br /> 3.1.13 Element#13 — Protect On-Site Stormwater Management BMP's <br /> for runoff from roofs and other surfaces 12 <br /> 3.2 Site Specific BMPs 16 <br /> 3.3 Additional Advanced BMPs 16 <br /> 4.0 Construction Phasing and BMP Implementation 17 <br /> 5.0 Pollution Prevention Team 19 <br /> 5.1 Roles and Responsibilities 19 <br /> 5.2 Team Members 20 <br /> 6.0 Site Inspections and Monitoring 21 <br /> 6.1 Site Inspection 21 <br /> 6.1.1 Site Inspection Frequency 21 <br /> 6.1.2 Site Inspection Documentation 21 <br /> 6.2 Stormwater Quality Monitoring 22 <br /> 6.2.1 Turbidity 22 <br /> 6.2.2 pH 23 <br /> 7.0 Reporting and Recordkeeping 25 <br /> 7.1 Recordkeeping 25 <br /> 7.1.1 Site Log Book 25 <br /> 7.1.2 Records Retention 25 <br /> ii <br />