Laserfiche WebLink
Stormwater Pollution Prevention Plan <br /> • Temporary and Permanent Seeding (BMP C120) <br /> • Interceptor Dike and Swale (BMP C200) <br /> • Straw Wattles (BMP C235) <br /> • Check Dams (BMP C207) <br /> • Materials on Hand (BMP C150) <br /> Alternate slope protection BMPs are included in Appendix C as a quick reference tool for the <br /> onsite inspector in the event the BMP(s) listed above are deemed ineffective or inappropriate <br /> during construction to satisfy the requirements set forth in the General NPDES Permit <br /> (Appendix D). To avoid potential erosion and sediment control issues that may cause a <br /> violation(s) of the NPDES Construction Stormwater permit (as provided in Appendix D), the <br /> Certified Erosion and Sediment Control Lead will promptly initiate the implementation of one or <br /> more of the alternative BMPs listed in Appendix C after the first sign that existing BMPs are <br /> ineffective or failing. <br /> 3.1.7 Element#7 — Protect Drain Inlets <br /> All storm drain inlets and culverts made operable during construction shall be protected to <br /> prevent unfiltered or untreated water from entering the drainage conveyance system. However, <br /> the first priority is to keep all access roads clean of sediment and keep street wash water <br /> separate from entering storm drains until treatment can be provided. Storm Drain Inlet <br /> Protection (BMP C220) will be implemented for all drainage inlets and culverts that could <br /> potentially be impacted by sediment-laden runoff on and near the project site. The following <br /> inlet protection measures will be applied on this project: <br /> • Storm Drain Inlet Protection (BMP C220) <br /> • Gravel and Wire Drop Inlet Protection <br /> • Catch Basin Filters <br /> • Alternative BMP not included in the SWMMVVW (2005) or SWMMEW (2004) <br /> If the BMP options listed above are deemed ineffective or inappropriate during construction to <br /> satisfy the requirements set forth in the General NPDES Permit (Appendix D), or if no BMPs are <br /> listed above but deemed necessary during construction, the Certified Erosion and Sediment <br /> Control Lead shall implement one or more of the alternative BMP inlet protection options listed <br /> in Appendix C. <br /> 10 <br />