Laserfiche WebLink
Stormwater Pollution Prevention Plan <br /> ❑ Routine maintenance and necessary repair of erosion and <br /> sediment control BMPs; <br /> ❑ Routine maintenance of public facilities or existing utility <br /> structures that do not expose the soil or result in the removal <br /> of the vegetative cover to soil; and <br /> ❑ Activities where there is 100 percent infiltration of surface <br /> water runoff within the site in approved and installed erosion <br /> and sediment control facilities. <br /> Coordination with Utilities and Other Jurisdictions <br /> ■ Care has been taken to coordinate with utilities, other construction <br /> projects, and the local jurisdiction in preparing this SWPPP and <br /> scheduling the construction work. <br /> Inspection and Monitoring <br /> • All BMPs shall be inspected, maintained, and repaired as needed <br /> to assure continued performance of their intended function. Site <br /> inspections shall be conducted by a person who is knowledgeable <br /> in the principles and practices of erosion and sediment control. <br /> This person has the necessary skills to: <br /> ❑ Assess the site conditions and construction activities that <br /> could impact the quality of stormwater, and <br /> ❑ Assess the effectiveness of erosion and sediment control <br /> measures used to control the quality of stormwater <br /> discharges. <br /> • A Certified Erosion and Sediment Control Lead shall be on-site or <br /> on-call at all times. <br /> • Whenever inspection and/or monitoring reveals that the BMPs <br /> identified in this SWPPP are inadequate, due to the actual <br /> discharge of or potential to discharge a significant amount of any <br /> pollutant, appropriate BMPs or design changes shall be <br /> implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP <br /> ■ This SWPPP shall be retained on-site or within reasonable access <br /> to the site. <br /> 14 <br />