Laserfiche WebLink
Stormwater Pollution Prevention Plan <br /> will be maintained on-site or within reasonable access to the site and be made available upon <br /> request to Ecology or the local jurisdiction. <br /> 6.2 Stormwater Quality Monitoring <br /> 6.2.1 Turbidity Sampling <br /> Monitoring requirements for the proposed project will include turbidity sampling to <br /> monitor site discharges for water quality compliance with the 2010 City of Everett <br /> Drainage manual and City of Everett Code Title 30.63A NPDES Construction <br /> Stormwater General Permit (Appendix D). Sampling will be conducted at all site <br /> discharge points at least once per calendar week. <br /> Turbidity monitoring will follow the analytical methodologies described in Section S4 of <br /> the 2005 Construction Stormwater General Permit (Appendix D). The key benchmark <br /> values that require action include 25 NTU and 250 NTU for turbidity. If the 25 NTU <br /> benchmark for turbidity is exceeded, the following steps will be conducted: <br /> 1. Ensure all BMPs specified in this SWPPP are installed and <br /> functioning as intended. <br /> 2. Assess whether additional BMPs should be implemented and make <br /> revisions to the SWPPP as necessary. <br /> 3. Sample the discharge location daily until the analysis results are <br /> less than 25 NTU (turbidity) or 32 cm (transparency). <br /> If the turbidity is greater than 25 NTU but less than 250 NTU for more than 3 days, <br /> additional treatment BMPs will be implemented within 24 hours of the third consecutive <br /> sample that exceeded the benchmark value. Additional treatment BMPs will include, <br /> but are not limited to, off-site treatment, infiltration, filtration and chemical treatment. <br /> If the 250 NTU benchmark for turbidity is exceeded at any time, the following steps will <br /> be conducted: <br /> 1. Notify Ecology by phone within 24 hours of analysis. <br /> 2. Continue daily sampling until the turbidity is less than 25 NTU. <br /> 3. Initiate additional treatment BMPs such as off-site treatment, <br /> infiltration, filtration and chemical treatment within 24 hours of the <br /> first 250 NTU exceedance. <br /> 22 <br />