Laserfiche WebLink
w PUBLIC WORKS. PERMIT Date: 9/28/2015 <br /> Public Works Permit#: PW1509-024 <br /> City of Everett Public Works Department <br /> 3200 Cedar Street Parent Permit#: <br /> ,\ / � 1 " Everett, WA 98201 <br /> Planning Reference#: <br /> (425)257-8810 <br /> Public Works Fee$: $ 69,666.37 <br /> Other$: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> Riverfront MF LLC Nick Abdelnour <br /> 11624 SE 5th St Suite 100 11624 SE 5th St Suite 100 <br /> BELLEVUE WA 98005 BELLEVUE WA 98005 <br /> PHONE: PHONE: 4255867700 <br /> TAX PARCEL ID# SITE ADDRESS: 3400 Riverfront Blvd <br /> Eclipse grading, roadway and utility Installations <br /> This permit coverage will consist of construction of the Riverfront roadway and the balance of street and utility construction <br /> for the Plat. Riverfront roadway construction can begin with the issuance of this permit. Additional construction for the plat <br /> will be contingent on approval of preload removal and signing of a hold harmless for the historic Eclipse Mill discharge <br /> pipe. <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 —I =; <br /> 4. Site Civil Work to be done per plans approved by the City Public Works dated -1--. - Na i c�' <br /> 01121!/2016 .I r-4,:;! ,;, w <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior , ,,,_, <br /> to starting construction and with all other inspection requests. See attached to request - -. I:3; [ 'l <br /> an inspection. MNI <br /> 6. Sewer system inspection methodology and tolerances will adhere to section 6-2 of the ii - ; =s <br /> City standards. Television inspection of new mains will be required per standard 6-9 of + -'x <br /> 41.4 <br /> the City Standards. An additional camera inspection will be required prior to the final lift qi !:23 <br /> of asphalt and acceptance of the plat. = F� ,. , .`o <br /> 7. Surcharge removal approval will be done separately from this permit.Approval for the :� , ,,-,.:4r!p., n <br /> removal, with the exception of work on the Riverfront roadway must be received before q : ; <br /> beginning work regulated by this permit. ? mil:43 r-r`r•,, <br /> 8. Keep City streets clean at all times. -.3 i42 73; ,ra C <br /> c- c c <br /> Public Works Fee Breakdown: '— <br /> CC <br /> Plan Review$22,832.82 O <br /> Site Inspection $45,665.64 <br /> Paving $1167.91 c:Ll <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> City of Everett from any and all claims for damages,costs,expenses,or <br /> —/6, City <br /> of action that may arise because of installation and maintenance of the <br /> improvement or other right-of-way use hereto applied for and further agrees to <br /> Ap oved for Construction Date remove same upon notice from the City and to replace public property <br /> X', damaged thereby. <br /> i <br /> FINAL INSPECTION Date ,-ty 4tt 2(ti /� <br /> ,,6 Approved as Constructed Sig ture of Applicant Date <br /> o'WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />