My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3400 RIVERFRONT BLVD BASE FILE 2020-07-15
>
Address Records
>
RIVERFRONT BLVD
>
3400
>
BASE FILE
>
3400 RIVERFRONT BLVD BASE FILE 2020-07-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 10:07:54 AM
Creation date
7/15/2020 10:05:41 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3400
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention Plan <br /> NPDES Construction Stormwater permit(as provided in Appendix D),the Certified Erosion and <br /> Sediment Control Lead will promptly initiate the implementation of one or more of the <br /> alternative BMPs listed in Appendix C after the first sign that existing BMPs are ineffective or <br /> failing. <br /> 3.1.3 Element#3—Control Flow Rates <br /> In order to protect the properties and waterways downstream of the project site, stormwater <br /> discharges from the site will be controlled. The specific BMPs for flow control that shall be used <br /> on this project include: <br /> No BMPs to be implemented <br /> No <br /> No BMPs are planned to control flow rates because the project is not creating any new <br /> impervious surface. <br /> Alternate flow control BMPs are included in Appendix C as a quick reference tool for the onsite <br /> inspector in the event the BMP(s) listed above are deemed ineffective or inappropriate during <br /> construction to satisfy the requirements set forth in the NPDES Permit or the Construction <br /> Stormwater General Permit(Appendix D). To avoid potential erosion and sediment control <br /> issues that may cause a violation(s),the Certified Erosion and Sediment Control Lead will <br /> promptly initiate the implementation of one or more of the alternative BMPs listed in Appendix <br /> C after the first sign that existing BMPs are ineffective or failing. <br /> The project site is located west of the Cascade Mountain Crest. As such,the project must <br /> comply with Minimum Requirement 7 (Ecology 2005). <br /> In general, discharge rates of stormwater from the site will be controlled where increases in <br /> impervious area or soil compaction during construction could lead to downstream erosion, or <br /> where necessary to meet local agency stormwater discharge requirements. However based on the <br /> nature of the work, discharge rates are not expected to increase. <br /> 3.1.4 Element#4—Install Sediment Controls <br /> All stormwater runoff from disturbed areas shall pass through an appropriate sediment removal <br /> BMP before leaving the construction site or prior to being discharged to an infiltration facility. <br /> The specific BMPs to be used for controlling sediment on this project include: <br /> • Silt Fence (BMP C233) <br /> • Storm Drain Inlet Protection(BMP C220) <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.