Laserfiche WebLink
Stormwater Pollution Prevention Plan <br /> NPDES Construction Stormwater permit(as provided in Appendix D),the Certified Erosion and <br /> Sediment Control Lead will promptly initiate the implementation of one or more of the <br /> alternative BMPs listed in Appendix C after the first sign that existing BMPs are ineffective or <br /> failing. <br /> 3.1.3 Element#3—Control Flow Rates <br /> In order to protect the properties and waterways downstream of the project site, stormwater <br /> discharges from the site will be controlled. The specific BMPs for flow control that shall be used <br /> on this project include: <br /> No BMPs to be implemented <br /> No <br /> No BMPs are planned to control flow rates because the project is not creating any new <br /> impervious surface. <br /> Alternate flow control BMPs are included in Appendix C as a quick reference tool for the onsite <br /> inspector in the event the BMP(s) listed above are deemed ineffective or inappropriate during <br /> construction to satisfy the requirements set forth in the NPDES Permit or the Construction <br /> Stormwater General Permit(Appendix D). To avoid potential erosion and sediment control <br /> issues that may cause a violation(s),the Certified Erosion and Sediment Control Lead will <br /> promptly initiate the implementation of one or more of the alternative BMPs listed in Appendix <br /> C after the first sign that existing BMPs are ineffective or failing. <br /> The project site is located west of the Cascade Mountain Crest. As such,the project must <br /> comply with Minimum Requirement 7 (Ecology 2005). <br /> In general, discharge rates of stormwater from the site will be controlled where increases in <br /> impervious area or soil compaction during construction could lead to downstream erosion, or <br /> where necessary to meet local agency stormwater discharge requirements. However based on the <br /> nature of the work, discharge rates are not expected to increase. <br /> 3.1.4 Element#4—Install Sediment Controls <br /> All stormwater runoff from disturbed areas shall pass through an appropriate sediment removal <br /> BMP before leaving the construction site or prior to being discharged to an infiltration facility. <br /> The specific BMPs to be used for controlling sediment on this project include: <br /> • Silt Fence (BMP C233) <br /> • Storm Drain Inlet Protection(BMP C220) <br /> 6 <br />