My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3400 RIVERFRONT BLVD BASE FILE 2020-07-15
>
Address Records
>
RIVERFRONT BLVD
>
3400
>
BASE FILE
>
3400 RIVERFRONT BLVD BASE FILE 2020-07-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 10:07:54 AM
Creation date
7/15/2020 10:05:41 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3400
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� t <br /> Stormwater Pollution Prevention Plan <br /> 3.1.5 Element#5—Stabilize Soils <br /> Exposed and unworked soils shall be stabilized with the application of effective BMPs to prevent <br /> erosion throughout the life of the project. The specific BMPs for soil stabilization that shall be <br /> used on this project include: <br /> • Temporary and Permanent Seeding(BMP C120) <br /> The proposed stockpile will be seeded once it is placed to stabilize the soil. <br /> Alternate soil stabilization BMPs are included in Appendix C as a quick reference tool for the <br /> onsite inspector in the event the BMP(s) listed above are deemed ineffective or inappropriate <br /> during construction to satisfy the requirements set forth in the General NPDES Permit(Appendix <br /> D). To avoid potential erosion and sediment control issues that may cause a violation(s) of the <br /> NPDES Construction Stormwater permit(as provided in Appendix D), the Certified Erosion and <br /> Sediment Control Lead will promptly initiate the implementation of one or more of the <br /> alternative BMPs listed in Appendix C after the first sign that existing BMPs are ineffective or <br /> failing. <br /> The project site is located west of the Cascade Mountain Crest. As such, no soils shall remain <br /> exposed and unworked for more than 7 days during the dry season(May 1 to September 30) and <br /> 2 days during the wet season(October 1 to April 30). Regardless of the time of year, all soils <br /> shall be stabilized at the end of the shift before a holiday or weekend if needed based on weather <br /> forecasts. <br /> In general, cut and fill slopes will be stabilized as soon as possible and soil stockpiles will be <br /> temporarily covered with plastic sheeting. All stockpiled soils shall be stabilized from erosion, <br /> protected with sediment trapping measures, and where possible, be located away from storm <br /> drain inlets,waterways, and drainage channels. <br /> 3.1.6 Element#6—Protect Slopes <br /> All cut and fill slopes will be designed, constructed, and protected in a manner than minimizes <br /> erosion. The following specific BMPs will be used to protect slopes for this project: <br /> • Temporary and Permanent Seeding(BMP C120) <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.