Laserfiche WebLink
s � <br /> Stormwater Pollution Prevention Plan <br /> streambanks, slopes, and downstream reaches shall be provided at the outlets of all conveyance <br /> systems. <br /> 3.1.9 Element#9—Control Pollutants <br /> All pollutants, including waste materials and demolition debris,that occur onsite shall be <br /> handled and disposed of in a manner that does not cause contamination of stormwater. Good <br /> housekeeping and preventative measures will be taken to ensure that the site will be kept clean, <br /> well organized, and free of debris. If required, BMPs to be implemented to control specific <br /> sources of pollutants are discussed below. <br /> Vehicles, construction equipment, and/or petroleum product storage/dispensing: <br /> • All vehicles, equipment, and petroleum product storage/dispensing areas <br /> will be inspected regularly to detect any leaks or spills, and to identify <br /> maintenance needs to prevent leaks or spills. <br /> • On-site fueling tanks and petroleum product storage containers shall <br /> include secondary containment. <br /> • Spill prevention measures, such as drip pans,will be used when <br /> conducting maintenance and repair of vehicles or equipment. <br /> • In order to perform emergency repairs on site,temporary plastic will be <br /> placed beneath and, if raining, over the vehicle. <br /> • Contaminated surfaces shall be cleaned immediately following any <br /> discharge or spill incident. <br /> The facility does not require a Spill Prevention,Control, and Countermeasure (SPCC)Plan under <br /> the Federal regulations of the Clean Water Act(CWA). <br /> 3.1.10 Element#10—Control Dewatering <br /> There will be no dewatering as part of this construction project. <br /> 3.1.11 Element#11—Maintain BMPs <br /> All temporary and permanent erosion and sediment control BMPs shall be maintained and <br /> repaired as needed to assure continued performance of their intended function. Maintenance and <br /> repair shall be conducted in accordance with each particular BMPs specifications (attached). <br /> Visual monitoring of the BMPs will be conducted at least once every calendar week and within <br /> 24 hours of any stormwater or non-stormwater discharge from the site. If the site becomes <br /> 11 <br />