My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3400 RIVERFRONT BLVD BASE FILE 2020-07-15
>
Address Records
>
RIVERFRONT BLVD
>
3400
>
BASE FILE
>
3400 RIVERFRONT BLVD BASE FILE 2020-07-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 10:07:54 AM
Creation date
7/15/2020 10:05:41 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3400
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention Plan <br /> 0 Assess the site conditions and construction activities that could <br /> impact the quality of stormwater, and <br /> ❑ Assess the effectiveness of erosion and sediment control measures <br /> used to control the quality of stormwater discharges. <br /> • A Certified Erosion and Sediment Control Lead shall be on-site or on-call <br /> at all times. <br /> • Whenever inspection and/or monitoring reveals that the BMPs identified <br /> in this SWPPP are inadequate, due to the actual discharge of or potential <br /> to discharge a significant amount of any pollutant, appropriate BMPs or <br /> design changes shall be implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP <br /> ■ This SWPPP shall be retained on-site or within reasonable access to the <br /> site. <br /> ■ The SWPPP shall be modified whenever there is a change in the design, <br /> construction, operation, or maintenance at the construction site that has, or <br /> could have, a significant effect on the discharge of pollutants to waters of <br /> the state. <br /> • The SWPPP shall be modified if, during inspections or investigations <br /> conducted by the owner/operator, or the applicable local or state <br /> regulatory authority, it is determined that the SWPPP is ineffective in <br /> eliminating or significantly minimizing pollutants in stormwater <br /> discharges from the site. The SWPPP shall be modified as necessary to <br /> include additional or modified BMPs designed to correct problems <br /> identified. Revisions to the SWPPP shall be completed within seven(7) <br /> days following the inspection. --- <br /> (East Response)As this project site is located east of the Cascade Mountain Crest,the project <br /> will be managed according to the following key project components: <br /> Phasing of Construction <br /> • The construction project is being phased to the extent practicable in order <br /> to prevent,to the maximum extent practicable,the transport of sediment <br /> from the development site during construction. Revegetation of exposed <br /> areas and maintenance of that vegetation shall be an integral part of the <br /> clearing activities during each phase. <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.