Laserfiche WebLink
Stormwater Pollution Prevention Plan <br /> 7.0 Reporting and Recordkeeping <br /> 7.1 Recordkeeping <br /> 7.1.1 Site Log Book <br /> A site log book will be maintained for all on-site construction activities and will include: <br /> ■ A record of the implementation of the SWPPP and other permit <br /> requirements; <br /> ■ Site inspections; and, <br /> ■ Stormwater quality monitoring. <br /> For convenience,the inspection form and water quality monitoring forms included in this <br /> SWPPP include the required information for the site log book. <br /> 7.1.2 Records Retention <br /> Records of all monitoring information(site log book, inspection reports/checklists, etc.),this <br /> Stormwater Pollution Prevention Plan, and any other documentation of compliance with permit <br /> requirements will be retained during the life of the construction project and for a minimum of <br /> three years following the termination of permit coverage in accordance with permit condition <br /> S5.C. <br /> 7.1.3 Access to Plans and Records <br /> The SWPPP, and Site Log Book will be retained on site or within reasonable access to the site <br /> and will be made immediately available upon request to Ecology or the local jurisdiction. A <br /> copy of this SWPPP will be provided to Ecology within 14 days of receipt of a written request <br /> for the SWPPP from Ecology. Any other information requested by Ecology will be submitted <br /> within a reasonable time. A copy of the SWPPP or access to the SWPPP will be provided to the <br /> public when requested in writing in accordance with permit condition S5.G. <br /> 7.1.4 Updating the SWPPP <br /> In accordance with Conditions S3, S4.B, and S9.B.3 of the General Permit, this SWPPP will be <br /> modified if the SWPPP is ineffective in eliminating or significantly minimizing pollutants in <br /> stormwater discharges from the site or there has been a change in design, construction, operation, <br /> or maintenance at the site that has a significant effect on the discharge, or potential for discharge, <br /> of pollutants to the waters of the State. The SWPPP will be modified within seven days of <br /> determination based on inspection(s)that additional or modified BMPs are necessary to correct <br /> problems identified, and an updated timeline for BMP implementation will be prepared. <br /> 27 <br />