Laserfiche WebLink
Y <br /> Stormwater Pollution Prevention Plan <br /> Appendix C — Alternative BMPs <br /> The following includes a list of possible alternative BMPs for each of the elements not described <br /> in the main SWPPP text. This list can be referenced in the event a BMP for a specific element is <br /> not functioning as designed and an alternative BMP needs to be implemented. <br /> Element#1 -Mark Clearing Limits <br /> Element#2 -Establish Construction Access <br /> Element#3 -Control Flow Rates <br /> Element#4 -Install Sediment Controls <br /> Advanced BMPs: <br /> Element#5 - Stabilize Soils <br /> Element#6-Protect Slopes <br /> Element#8- Stabilize Channels and Outlets <br /> 32 <br />