Laserfiche WebLink
• <br /> V. Site Information <br /> Site or Project Name Site Acreage <br /> Riverfront Commercial Total size of your site/project,including support activities such as <br /> Street Address or Location Description (If the site lacks a off-site equipment staging yards, material storage areas, borrow <br /> street address, list its specific location. For example, areas,etc.(that you own/control): 70acres. <br /> Intersection of Highway 61 and 34.) <br /> Total area of soil disturbance(grading and/or excavating)for your <br /> East ofS3rd Aye at East end of 41st St West of site/project over the life of the project: 70acres. (Note: 1 acre= <br /> Snohomish 43,560 ft2.) <br /> Parcel ID#: (Optional) Concrete/Engineered Soils <br /> How many yards of concrete will be poured over the life of the <br /> Type of Construction Activity(check all that apply): project? (0 yd3{estimate) <br /> Fl R• esidential <br /> 151 Commercial How many yards of recycled concrete will be used over the life of <br /> Industrial the project? ' yd3(estimate) <br /> n H• ighway or Road(city,county,state) <br /> ® Utilities(specify):Gas, Electricity,Phone,Cable . Will any engineered soils be used?(For example:manufactured <br /> LI O• ther(specify): soil stabilizers,fly ash,cement treated base,cement kiln dust,etc.) <br /> ❑Yes ® No <br /> City(or nearest city): Zip Code: Estimated project start-up date(mm/dd/yy):9/1/2014 <br /> County: Estimated project completion date(mm/dd/yy): 9/1/2020 <br /> Record the latitude and longitude of the main entrance to the site or the approximate center of site. <br /> Latitude:47.969544 °N Longitude:-122.193353 °W <br /> VI. Existing Site Conditions <br /> 1. Are you aware of contaminated soils present on the site? ❑Yes ® No <br /> 2. Are you aware of groundwater contamination located within the site boundary? ❑Yes No <br /> 3. If you answered yes to questions 1 or 2, will any contaminated soils be disturbed or will any contaminated groundwater be <br /> discharged due to the proposed construction activity? ❑Yes n No <br /> ["Contaminated"and"contamination"here mean containing any hazardous substance(as defined in WAC 173-340-200)that does not <br /> occur naturally or occurs at greater than natural background levels.] <br /> If you answered yes to Question 3,please provide detailed information on the locations,contaminants,and contaminant <br /> concentrations(if known), and pollution prevention and/or treatment Best Management Practices(BMPs)proposed to-control the <br /> discharge of soil/groundwater contaminants.This information should include related portions of the Stormwater Pollution Prevention <br /> Plan (SWPPP)that describe how contaminated and potentially contaminated construction stormwater and dewatering water will be <br /> managed. <br /> VII. Stormwater Pollution Prevention Plan (SWPPP) <br /> You must develop a SWPPP prior to starting construction. Do not submit your SWPPP with your application.The exception-is that <br /> Ecology may request a copy of all or part of the SWPPP if you answered yes to the questions in Part VI. <br /> ECY 020-85(Rev.12/14) 2/M <br />