My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3400 RIVERFRONT BLVD BASE FILE 2020-07-15
>
Address Records
>
RIVERFRONT BLVD
>
3400
>
BASE FILE
>
3400 RIVERFRONT BLVD BASE FILE 2020-07-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 10:07:54 AM
Creation date
7/15/2020 10:05:41 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3400
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> V. Site Information <br /> Site or Project Name Site Acreage <br /> Riverfront Commercial Total size of your site/project,including support activities such as <br /> Street Address or Location Description (If the site lacks a off-site equipment staging yards, material storage areas, borrow <br /> street address, list its specific location. For example, areas,etc.(that you own/control): 70acres. <br /> Intersection of Highway 61 and 34.) <br /> Total area of soil disturbance(grading and/or excavating)for your <br /> East ofS3rd Aye at East end of 41st St West of site/project over the life of the project: 70acres. (Note: 1 acre= <br /> Snohomish 43,560 ft2.) <br /> Parcel ID#: (Optional) Concrete/Engineered Soils <br /> How many yards of concrete will be poured over the life of the <br /> Type of Construction Activity(check all that apply): project? (0 yd3{estimate) <br /> Fl R• esidential <br /> 151 Commercial How many yards of recycled concrete will be used over the life of <br /> Industrial the project? ' yd3(estimate) <br /> n H• ighway or Road(city,county,state) <br /> ® Utilities(specify):Gas, Electricity,Phone,Cable . Will any engineered soils be used?(For example:manufactured <br /> LI O• ther(specify): soil stabilizers,fly ash,cement treated base,cement kiln dust,etc.) <br /> ❑Yes ® No <br /> City(or nearest city): Zip Code: Estimated project start-up date(mm/dd/yy):9/1/2014 <br /> County: Estimated project completion date(mm/dd/yy): 9/1/2020 <br /> Record the latitude and longitude of the main entrance to the site or the approximate center of site. <br /> Latitude:47.969544 °N Longitude:-122.193353 °W <br /> VI. Existing Site Conditions <br /> 1. Are you aware of contaminated soils present on the site? ❑Yes ® No <br /> 2. Are you aware of groundwater contamination located within the site boundary? ❑Yes No <br /> 3. If you answered yes to questions 1 or 2, will any contaminated soils be disturbed or will any contaminated groundwater be <br /> discharged due to the proposed construction activity? ❑Yes n No <br /> ["Contaminated"and"contamination"here mean containing any hazardous substance(as defined in WAC 173-340-200)that does not <br /> occur naturally or occurs at greater than natural background levels.] <br /> If you answered yes to Question 3,please provide detailed information on the locations,contaminants,and contaminant <br /> concentrations(if known), and pollution prevention and/or treatment Best Management Practices(BMPs)proposed to-control the <br /> discharge of soil/groundwater contaminants.This information should include related portions of the Stormwater Pollution Prevention <br /> Plan (SWPPP)that describe how contaminated and potentially contaminated construction stormwater and dewatering water will be <br /> managed. <br /> VII. Stormwater Pollution Prevention Plan (SWPPP) <br /> You must develop a SWPPP prior to starting construction. Do not submit your SWPPP with your application.The exception-is that <br /> Ecology may request a copy of all or part of the SWPPP if you answered yes to the questions in Part VI. <br /> ECY 020-85(Rev.12/14) 2/M <br />
The URL can be used to link to this page
Your browser does not support the video tag.