Laserfiche WebLink
X. State Environmental Policy Act(SEPA) <br /> This Notice of Intent(NOl)is incomplete and cannot be approved until the applicable SEPA requirements under Chapter 197-11 WAC <br /> are met. <br /> Who is the SEPA lead agency on your site?Snohomish County <br /> Has the SEPA lead agency issued a final decision on your checklist?(if there is a comment period,the SEPA decision is <br /> final at the close of the comment period) ❑No ®Yes Exempt*(*attach written documentation if Exempt). <br /> If No:The NOl is incomplete. Ecology will hold the application until a final SEPA decision is made or the Construction Stormwater <br /> NOl public comment period ends,whichever is later. You must notify Ecology once the SEPA lead agency has issued a final <br /> decision following any comment period. <br /> If Yes:Type of SEPA threshold determination issued:❑ Determination of Non-Significance(DNS) ❑ Mitigated DNS(MDNS) <br /> ri Determination of Significance(DS) ® Final Environmental Impact Statement(EIS) [I Other: <br /> Date when SEPA comment period ended or will end: 2/4J2008 <br /> Notify Ecology if the SEPA determination is appealed. More SEPA information is available at: <br /> www.ecy.wa.qov/programs/sea/sepale-review.html. <br /> XI. Other Ecology National Pollutant Discharge Elimination System (NPDES)and/or State Waste Discharge Permits <br /> List any other Water Quality permits(Industrial stormwater, Individual stormwater,etc.)for this site: <br /> Name of Water Quality Permit Permit Number <br /> XII. Public Notice <br /> You must publish a public notice at least once a week for two consecutive weeks with at least seven days between publications, in a <br /> newspaper of general circulation in the county in which the construction is to take place. Ecology cannot grant permit coverage <br /> sooner than the end of the 30-day public comment period,which begins on the date of the second public notice. <br /> Mail or fax(360-407-6426)the NOI to Ecology on or before the first public notice date. If you fax the public notice to Ecology, you <br /> must also mail a hard copy. Failure to do so may delay the issuance of your permit. <br /> Provide the exact dates(mm/dd/yy)that the first and second public notices will appear in the newspaper(s): <br /> Name of the newspaper publishing the notices: Everett-The Herald <br /> First notice: b`t / 09N/ 1$ <br /> Second notice: t?`r / 0 / t (Begins 30-day public comment period.) <br /> For example: First notice: Friday 01/01/14 Second notice: Friday 01/08/14 <br /> ECY 020-85(Rev.12/14) <br />