My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3400 RIVERFRONT BLVD BASE FILE 2020-07-15
>
Address Records
>
RIVERFRONT BLVD
>
3400
>
BASE FILE
>
3400 RIVERFRONT BLVD BASE FILE 2020-07-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 10:07:54 AM
Creation date
7/15/2020 10:05:41 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3400
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
X. State Environmental Policy Act(SEPA) <br /> This Notice of Intent(NOl)is incomplete and cannot be approved until the applicable SEPA requirements under Chapter 197-11 WAC <br /> are met. <br /> Who is the SEPA lead agency on your site?Snohomish County <br /> Has the SEPA lead agency issued a final decision on your checklist?(if there is a comment period,the SEPA decision is <br /> final at the close of the comment period) ❑No ®Yes Exempt*(*attach written documentation if Exempt). <br /> If No:The NOl is incomplete. Ecology will hold the application until a final SEPA decision is made or the Construction Stormwater <br /> NOl public comment period ends,whichever is later. You must notify Ecology once the SEPA lead agency has issued a final <br /> decision following any comment period. <br /> If Yes:Type of SEPA threshold determination issued:❑ Determination of Non-Significance(DNS) ❑ Mitigated DNS(MDNS) <br /> ri Determination of Significance(DS) ® Final Environmental Impact Statement(EIS) [I Other: <br /> Date when SEPA comment period ended or will end: 2/4J2008 <br /> Notify Ecology if the SEPA determination is appealed. More SEPA information is available at: <br /> www.ecy.wa.qov/programs/sea/sepale-review.html. <br /> XI. Other Ecology National Pollutant Discharge Elimination System (NPDES)and/or State Waste Discharge Permits <br /> List any other Water Quality permits(Industrial stormwater, Individual stormwater,etc.)for this site: <br /> Name of Water Quality Permit Permit Number <br /> XII. Public Notice <br /> You must publish a public notice at least once a week for two consecutive weeks with at least seven days between publications, in a <br /> newspaper of general circulation in the county in which the construction is to take place. Ecology cannot grant permit coverage <br /> sooner than the end of the 30-day public comment period,which begins on the date of the second public notice. <br /> Mail or fax(360-407-6426)the NOI to Ecology on or before the first public notice date. If you fax the public notice to Ecology, you <br /> must also mail a hard copy. Failure to do so may delay the issuance of your permit. <br /> Provide the exact dates(mm/dd/yy)that the first and second public notices will appear in the newspaper(s): <br /> Name of the newspaper publishing the notices: Everett-The Herald <br /> First notice: b`t / 09N/ 1$ <br /> Second notice: t?`r / 0 / t (Begins 30-day public comment period.) <br /> For example: First notice: Friday 01/01/14 Second notice: Friday 01/08/14 <br /> ECY 020-85(Rev.12/14) <br />
The URL can be used to link to this page
Your browser does not support the video tag.