My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2721 WETMORE AVE MARQUEE APARTMENTS Plans 2024-06-18
>
Address Records
>
WETMORE AVE
>
2721
>
MARQUEE APARTMENTS
>
Plans
>
2721 WETMORE AVE MARQUEE APARTMENTS Plans 2024-06-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2024 2:56:17 PM
Creation date
7/23/2020 9:26:58 AM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2721
Tenant Name
MARQUEE APARTMENTS
Permit
B1911-008
Notes
TOWER CRANE INFORMATION
Address Document Type
Plans
Imported From Microfiche
No
Supplemental fields
Description (Filename)
Untitled
Status
Active
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I( I <br /> r.' -?.--"..2--'' ''r <br /> pp r `T 2601; l U <br /> : „nr V <br /> The general requirements for the elements that are part of the anchoring base slab are: <br /> Concrete: HA-25, with granulometry of between 30/40 mm and water-cement ratio S. 0.45. <br /> During the setting time, these constructions must be kept damp for 3 days minimum. We do <br /> not recommend the crane erection till the reinforced concrete set and has acquired at least 70 <br /> %of final resistance. <br /> Cage for reinforcement: cage B 500 5,it must be in a good condition and free of rust. <br /> 1.1.CONSTRUCTION OF THE FOUNDATION PAD AND PROCEDURE S17-S21 TO <br /> FOLLOW <br /> 1.- Excavate a hole with the right dimensions according to the technical specifications of the <br /> ground and the reactions that the crane may transmit to the ground,depending on the specific <br /> assembly project of a tower crane. <br /> 2.-Place the foundation anchor in the inside of the hole made,and center it according to the <br /> characteristics of the calculated concrete slab given by the engineering calculations, and <br /> wedge the anchor in order to obtain a perfect leveling. <br /> r, 1 <br /> /'�f <br /> - i..- rf t ;%' <br /> •41 . t,1'1om,.• . :; <br /> it- -,":-- -,, <br /> Z CHAPTER 5A-ERECTION WITH ANCHOR VERSION <br /> February 2015_Rev.0.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.