Laserfiche WebLink
J <br /> sAEZ 1:1H UR goo®a@ FAQaUad <br /> 'VILE, SED 04 <br /> cranes <br /> 3.-Once the foundation anchor is wedged,verify the leveling in both directions of the diagonal <br /> and in the four ends of the anchor,as shown in the following pictures. <br /> 'l , T---41-1°1-4r _ t -'11-- <br /> . •, 1,:-...‘, <br /> • <br /> :: ,. -"' t .,.. ! Figure 3. Diagonal verification of the <br /> °40rt.,„ leveling of the anchor.This <br /> lip_ .." verification must be done in both <br /> `+ , directions. <br /> „^rr . <br /> oroL,7.114immi ,11 onli Mint git-; :1" r., _.yr. <br /> "�w... <br /> i - 41r - , Figure 4.-Diagonal verification of the <br /> leveling of the anchor.This <br /> s' <br /> vdierification must be done in both <br /> vrections. <br /> 11 <br /> • "arm iiIr <br /> Figure 5.-Longitudinal verification of <br /> the leveling of the anchor,must be <br /> done on four sides. <br /> I CHAPTER 5A- ERECTION WITH ANCHOR VERSION <br /> February 2015_Rev.0.1 <br />