My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS [Modified per Addendum #1] <br /> I <br /> Note: Unit prices for all items,all extensions,and the total amount bid must be shown. Where conflict occurs between the unit price and <br /> the total amount named for any item,the unit price shall prevail,and totals shall be corrected to conform thereto. All entries must be <br /> 111 typed or entered in ink. <br /> BID SCHEDULE <br /> IBIDDER: <br /> ISCHEDULE A: COMBINED SEWER <br /> ITEM PLAN ITEM DESCRIPTION UNIT PRICE TOTAL <br /> 1 NO. QUANTITY AMOUNT <br /> 1 1 LS MOBILIZATION <br /> 2 1 LS SURVEYING <br /> 3 1 LS CONTRACTORS LIAISON <br /> 4 1,480 HR TRAFFIC CONTROL LABOR <br /> 1 TRAFFIC CONTROL - OFF-DUTY $30,800 $30,800 <br /> 5 1 FA POLICE OFFICER <br /> I MAINTENANCE AND PROTECTION <br /> 6 1 LS OF TRAFFIC CONTROL <br /> TRENCH EXCAVATION SAFETY <br /> I 7 1 LS SYSTEMS <br /> 8 145 HR STREET CLEANING AND SWEEPING <br /> EROSION/WATER POLLUTION <br /> I9 1 FA CONTROL $8,400 $8,400 <br /> SAWCUT EXISTING <br /> 10 12,716 LF IMPROVEMENTS <br /> ISAWCUT CEMENT CONCRETE <br /> 11 1,980 LF CURB & GUTTER& SIDEWALK <br /> CRUSHED SURFACING TOP <br /> 12 300 TON COURSE <br /> FOUNDATION MATERIAL, CLASS A <br /> I 13 300 TON OR B <br /> CRUSHED SURFACING BASE <br /> 14 5,454 TON COURSE <br /> I <br /> 15 9,852 TON GRAVEL BORROW <br /> 16 80 CY CONTROLLED DENSITY FILL <br /> I <br /> 17 1 LS TEMPORARY ROADWAY PATCH <br /> 18 877 LF COMBINED SEWER PIPE, 8-INCH <br /> 19 30 LF COMBINED SEWER PIPE, 10-INCH <br /> I20 510 LF COMBINED SEWER PIPE, 12-INCH <br /> 21 477 LF COMBINED SEWER PIPE, 18-INCH <br /> I 22 961 LF COMBINED SEWER PIPE, 24-INCH <br /> COMBINED SEWER MANHOLE, <br /> 23 7 EA TYPE 1, 48-INCH DIA. <br /> 1 Sewer 0 Division P-PROPOSAL Addendum No. 1 <br /> WO No.-UP3691 SP-23 May 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.