My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 7-04.2 Materials 181 <br /> 7-04.3 Construction Requirements 181 I <br /> 7-04.4 Measurement 182 <br /> 7-04.5 Payment 182 <br /> 7-05 MANHOLES, INLETS, AND CATCH BASINS 182 I <br /> 7-05.1 Description 180 <br /> 7-05.2 Materials 183 <br /> 7-05.3 Construction Requirements 183 <br /> 7-05.4 Measurement 185 <br /> 7-05.5 Payment 185 <br /> 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS 185 I <br /> 7-08.1 Description 185 <br /> 7-08.2 Materials 185 <br /> 7-08.3 Construction Requirements 186 <br /> 7-08.4 Measurement 188 <br /> 7-08.5 Payment 188 <br /> 7-09 WATERMAINS 188 <br /> 7-09.1 Description 188 <br /> 7-09.2 Materials 189 I <br /> 7-09.3 Construction Requirements 189 <br /> 7-09.4 Measurement 195 <br /> 7-09.5 Payment 195 I <br /> 7-12 VALVES FOR WATERMAINS 195 <br /> 7-12.1 Description 195 <br /> 7-12.2 Materials 195 I <br /> 7-12.3 Construction Requirements 195 <br /> 7-12.4 Measurement 196 <br /> 7-12.5 Payment 196 I <br /> 7-14 HYDRANTS 196 <br /> 7-14.1 Description 196 <br /> 7-14.2 Materials 196 I <br /> 7-14.3 Construction Requirements 196 <br /> 7-14.4 Measurement 197 <br /> 7-14.5 Payment 197 I <br /> 7-15 SERVICE CONNECTIONS 197 <br /> 7-15.1 Description 197 <br /> 7-15.2 Materials 198 <br /> 7-15.3 Construction Requirements 198 <br /> 7-15.4 Measurement 199 I <br /> 7-15.5 Payment 199 <br /> 7-17 SANITARY SEWERS 199 <br /> 7-17.1 Description 199 <br /> 7-17.2 Materials 199 <br /> Sewer 0 Table of Contents- April,2020 I <br /> WO No.-UP3691 SP-vi <br />
The URL can be used to link to this page
Your browser does not support the video tag.