Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS [Modified per Addendum #1] <br /> SCHEDULE B: WATER <br /> ITEM PLAN ITEM DESCRIPTION UNIT TOTALI <br /> NO. QUANTITY PRICE AMOUNT <br /> 61 1 LS MOBILIZATION I <br /> 62 1 LS SURVEYING <br /> 63 1 LS CONTRACTOR'S LIAISON I <br /> 64 460 HR TRAFFIC CONTROL LABOR <br /> TRAFFIC CONTROL - OFF-DUTY POLICE 1 <br /> 65 1 FA OFFICER $13,200 $13,200 <br /> MAINTENANCE AND PROTECTION OF <br /> 66 1 LS TRAFFIC CONTROL <br /> TRENCH EXCAVATION SAFETY <br /> 67 1 LS SYSTEMS I <br /> 68 45 HR STREET CLEANING AND SWEEPING <br /> EROSION/WATER POLLUTION <br /> 69 1 FA CONTROL $3,600 $3 600 <br /> 70 5,526 LF SAWCUT EXISTING IMPROVEMENTS <br /> SAWCUT CEMENT CONCRETE CURB & <br /> 71 103 LF GUTTER & SIDEWALK <br /> 72 446 TON CRUSHED SURFACING TOP COURSE I <br /> FOUNDATION MATERIAL, CLASS A OR <br /> 73 100 TON B <br /> 74 91 TON CRUSHED SURFACING BASE COURSE <br /> 75 642 TON GRAVEL BORROW I <br /> 76 20 CY CONTROLLED DENSITY FILL <br /> 77 1 LS TEMPORARY ROADWAY PATCH I <br /> DUCTILE IRON PIPE FOR WATERMAIN, <br /> 78 78 LF 6-INCH DIAM. <br /> DUCTILE IRON PIPE FOR WATERMAIN, <br /> 79 1,650 LF 8-INCH DIAM. <br /> DUCTILE IRON PIPE FOR WATERMAIN, <br /> 80 86 LF 14-INCH DIAM. <br /> 81 3 EA GATE VALVE, 4-INCH <br /> 82 5 EA GATE VALVE, 6-INCH <br /> 83 11 EA GATE VALVE, 8-INCH I <br /> Sewer 0 Division P-PROPOSAL Addendum No. 1 <br /> WO No.-UP3691 SP-26 May 2020 <br />