My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS [Modified per Addendum #1] <br /> SCHEDULE B: WATER <br /> ITEM PLAN ITEM DESCRIPTION UNIT TOTALI <br /> NO. QUANTITY PRICE AMOUNT <br /> 61 1 LS MOBILIZATION I <br /> 62 1 LS SURVEYING <br /> 63 1 LS CONTRACTOR'S LIAISON I <br /> 64 460 HR TRAFFIC CONTROL LABOR <br /> TRAFFIC CONTROL - OFF-DUTY POLICE 1 <br /> 65 1 FA OFFICER $13,200 $13,200 <br /> MAINTENANCE AND PROTECTION OF <br /> 66 1 LS TRAFFIC CONTROL <br /> TRENCH EXCAVATION SAFETY <br /> 67 1 LS SYSTEMS I <br /> 68 45 HR STREET CLEANING AND SWEEPING <br /> EROSION/WATER POLLUTION <br /> 69 1 FA CONTROL $3,600 $3 600 <br /> 70 5,526 LF SAWCUT EXISTING IMPROVEMENTS <br /> SAWCUT CEMENT CONCRETE CURB & <br /> 71 103 LF GUTTER & SIDEWALK <br /> 72 446 TON CRUSHED SURFACING TOP COURSE I <br /> FOUNDATION MATERIAL, CLASS A OR <br /> 73 100 TON B <br /> 74 91 TON CRUSHED SURFACING BASE COURSE <br /> 75 642 TON GRAVEL BORROW I <br /> 76 20 CY CONTROLLED DENSITY FILL <br /> 77 1 LS TEMPORARY ROADWAY PATCH I <br /> DUCTILE IRON PIPE FOR WATERMAIN, <br /> 78 78 LF 6-INCH DIAM. <br /> DUCTILE IRON PIPE FOR WATERMAIN, <br /> 79 1,650 LF 8-INCH DIAM. <br /> DUCTILE IRON PIPE FOR WATERMAIN, <br /> 80 86 LF 14-INCH DIAM. <br /> 81 3 EA GATE VALVE, 4-INCH <br /> 82 5 EA GATE VALVE, 6-INCH <br /> 83 11 EA GATE VALVE, 8-INCH I <br /> Sewer 0 Division P-PROPOSAL Addendum No. 1 <br /> WO No.-UP3691 SP-26 May 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.