My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> SUBCONTRACTORS FORM <br /> 1. For heating, ventilation, air conditioning,plumbing (as defined by RCW Chap. 18.106) and electrical ' <br /> work (as defined by RCW Chap. 19.28), Bidder MUST either identify itself or Subcontractors in the <br /> chart below. If Bidder believes such work is not part of the scope of Work, Bidder shall write "NO <br /> WORK". <br /> 2. Bidder shall not list more than one Subcontractor for each category of work identified, unless <br /> Subcontractors vary with bid alternates, in which case the Bidder must indicate which Subcontractor <br /> will be used for which alternate. <br /> 3. Bidder's bid shall be deemed nonresponsive and void if: <br /> A. For heating, ventilation, air conditioning, plumbing and electrical work, Bidder fails (1) to <br /> submit as part of the Bid the names of such Subcontractors, (2) to name itself to perform such <br /> Work, or(3)to write "No Work"; or <br /> B. Bidder names two or more Subcontractors to perform the same work. <br /> 4. The requirement to name the Bidder's proposed heating, ventilation and air conditioning, plumbing, <br /> and electrical subcontractors applies only to proposed heating, ventilation and air conditioning, <br /> plumbing, and electrical subcontractors who will contract directly with the general contractor <br /> submitting the Bid to the City. <br /> Type/Scope of Work ' Name and Address of`Subcontractor/Or.Bidder <br /> HEATING <br /> Subcontractor,bidder or"no work" MUST be NO WORK <br /> stated <br /> VENTILATION AND AIR CONDITIONING <br /> Subcontractor,bidder or "no work"MUST be NO WORK <br /> stated <br /> PLUMBING(as described in RCW Chap. 18.106) <br /> Subcontractor,bidder or "no work"MUST be NO WORK <br /> stated <br /> ELECTRICAL (as described in RCW Chap. SAIL ELECTRIC INC <br /> 19.28) 911 SLATER RD <br /> Subcontractor, bidder or "no work" MUST be BELL NGHAM,WA 98226 <br /> stated <br /> I <br /> I <br /> 1 <br /> Sewer 0 Division P-PROPOSAL April,2020 <br /> WO No.-UP3691 SP-30 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.