My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 11 <br /> CITY OF EVERETT,WASHINGTON <br /> ICONTRACT <br /> THIS CONTRACT is made and entered into this 10ti\day of 1"VN'E , 20?..q by and between <br /> the City of Everett, Washington, a municipal corporation existing under the laws of the State of <br /> IWashington, hereinafter called the "City," and <br /> I tvl"F SZW vS1 tot-‘S c g.0G-tk.a1., , .1 NC-, a <br /> t.uRSI-1 i*-5t1• C:.)Rea2A c wr•> ,hereinafter called the "Contractor." <br /> IIn consideration of the sums to be paid to it by the City,Contractor hereby covenants and agrees to furnish <br /> all labor, tools, materials, equipment, and supplies required to build and construct and to build and <br /> I construct in a workmanlike manner the work, improvements, and appurtenances in accordance with the <br /> Specifications and Plans entitled: " 5t-wW Q " (the"Project"). <br /> ucuxrt vrvc�- C <br /> 1. Contract Documents. The following documents ("Contract Documents") are incorporated by <br /> Ireference and are hereby made a part of this Contract: <br /> A. Notice to Contractors <br /> I <br /> B. Instructions to Bidders (if any) <br /> C. Washington State Department of Transportation Standard Specifications 2018 as modified <br /> by all amendments thereto as of the date of bid opening of this Project ("Standard <br /> ISpecifications"). <br /> D. Special Provisions <br /> IE. Plans, Drawings and Project Specifications <br /> F. Addenda(if any) <br /> IG. Payment Bond and Performance Bond <br /> H. Contractor's Proposal/Bid(conformed copy dated S--19-- fop,p ) <br /> I I. All provisions required by law whether set forth and reproduced herein or not <br /> 2. Time for Completion. Substantial completion shall be achieved within One Hundred and Ten(110) <br /> working days of the effective date of the Notice to Proceed. Physical completion shall be within Twenty <br /> I (20) working days of the actual date of issuance of substantial completion. <br /> 3. Liquidated Damages. The parties agree the City will suffer damage and be put to additional expense <br /> in the event that the Contractor does not complete the work in all respects and have it ready for use by the <br /> Isubstantial completion date stated. Because it is difficult to accurately compute the amount of such costs <br /> and damages, the Contractor hereby covenants and agrees to pay to the City liquidated damages as <br /> computed in Section 1-08.9 of the Standard Specifications, for each and every working day required to <br /> Iaccomplish substantial completion of the work in excess of the period established above for substantial <br /> completion. For overruns in contract time occurring after the physical completion date, liquidated <br /> damages shall be assessed at the rate of ten percent (10%) of the amount computed in Section 1-08.9 of <br /> I <br /> the Standard Specifications until the work is physically complete. <br /> 4. Contract Amount. The amount of this Contract is Li a3M '7, $c1 <br /> I ($ - - ) and is based on the proposa{/bid submitted by Contractor dated <br /> 5 -►w ).p . The basis for final payment will be the actual amount of work performed according <br /> to the Contract Documents and payments,whether partial or final, shall be made as specified therein. <br /> I <br /> Sewer 0 Division C-CONTRACT April,2020 <br /> IWO No.-UP3691 SP-37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.