My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-04.4(2) Extra Work <br /> I (******) <br /> At its sole option, the City may (1) perform Extra Work itself, (2) employ others to do it, <br /> (3) direct the Contractor to perform the Extra Work at existing unit Bid price, (4) direct <br /> I the Contractor to perform the Extra Work at a mutually agreed upon price, or (5) direct <br /> the Contractor to perform the Extra Work on a Force Account basis. <br /> 1-04.4(3) Change Orders <br /> Changes to the Work may result in an increase or decrease in Contract Sum, as <br /> provided in 1-09.4 EQUITABLE ADJUSTMENT. Requests for an increase in Contract <br /> I Time shall be made as provided in 1-08.3 PROGRESS SCHEDULE as applicable. <br /> Substantial changes in Contract Time, Contract Sum or Work will often be negotiated <br /> and agreed between the Contractor and City before the City directs the Contractor to <br /> proceed with the change. <br /> IIf the Contractor and City agree on the scope of Work and any changes to Contract <br /> Sum and Contract Time, the Contractor and City shall execute an agreed Change <br /> Order. However, if the Contractor and City do not agree, the City may, in its sole <br /> I discretion, issue a unilateral Change Order in the form attached to the Contract <br /> Documents changing the scope of Work and making any adjustments to the Contract <br /> Sum pursuant to 1-09.4 EQUITABLE ADJUSTMENT and Contract Time pursuant to 1- <br /> I 08.8 EXTENSIONS OF TIME in such amount and for such time as the City believes <br /> appropriate. Contractor agrees to use the agreed Change Order form attached to the <br /> Contract Documents. The Contractor accepts all requirements, terms and conditions <br /> I of a Change Order by: signing it; writing a separate acceptance; or by failing to notify <br /> the City immediately in writing that Contractor disagrees with the Change Order and <br /> does not intend to be bound by its terms. <br /> I <br /> The Contractor waives and is estopped from denying its agreement with any unilateral <br /> Change Order for which the Contractor does not immediately give Notice to the City as <br /> provided in 1-04.5 NOTICE BY CONTRACTOR in these Special Provisions and <br /> submitting a Contract Claim as provided in 1-09.11(2) CONTRACT CLAIMS in these <br /> I Special Provisions. A unilateral Change Order that is not timely protested as provided <br /> in this section shall be full payment and final settlement of all asserted and unasserted <br /> Contract Claims for Contract Time and all costs of any kind, including costs of Delays, <br /> I inefficiencies and impacts, related to, arising out of, or resulting from, any Work <br /> described in the Change Order. <br /> The Contractor shall obtain written consent of the Surety or Sureties if the City's <br /> I Representative requests such consent. <br /> 1-04.4(4) Value Engineering and Cost Sharing <br /> (******) <br /> I The Contractor may submit proposals for changing the Plans, Specifications, or other <br /> requirements of the Contract Documents and the City, in its sole discretion, may <br /> accept or reject such proposals. If accepted by the City and if the proposal decreases <br /> I the direct, actual costs of constructing the Work, the Contract Sum shall be reduced by <br /> fifty percent (50%) of the direct, actual construction cost saved. Because the City has <br /> the sole discretion whether to consider, accept or reject the Contractor's proposal and <br /> the Contractor has no right to require the City to consider or accept such proposals, <br /> I the City's decision is not reviewable by any court. This subsection applies only to <br /> change proposals initiated solely by the Contractor, or its Subcontractors and <br /> suppliers, and does not apply to change proposals requested or initiated by the City or <br /> I the City's Representative. The City is not obligated or required to consider any <br /> Sewer O Division 1-GENERAL REQUIREMENTS April,2020 <br /> WO No-UP3691 SP-61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.