My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' CITY OF EVERETT SPECIAL PROVISIONS [Modified per Addendum #1] <br /> proceed with the Work represented by the Working Drawing until comments from the <br /> ' Engineer have been addressed. <br /> 3. Type 2E - Same as a Type 2 Working Drawing with Engineering as described <br /> below. <br /> 4. Type 3 - Submitted for City review and approval. Unless otherwise stated in the <br /> Contract, the Engineer will require up to 20 working days from the date the Working <br /> Drawing is received until it is returned to the Contractor. The Contractor shall obtain <br /> t the Engineer's written approval before proceeding with the Work represented by the <br /> Working Drawing. <br /> 5. Type 3E - Same as a Type 3 Working Drawing with Engineering as described <br /> ' below. <br /> Supplement 1-05.3 as follows: <br /> The Contract Documents include Plans that show such details as are reasonably <br /> ' necessary to give a comprehensive understanding of the Work. The Contractor shall <br /> submit alterations affecting the requirements and information in the Plans in writing to <br /> the Engineer for approval prior to performing such Work. <br /> ' The Engineer may supplement the Plans with additional drawings and explanations, <br /> consistent with the purpose and intent of the original Plans, to detail and illustrate the <br /> Work. The Contractor shall perform the Work according to these supplemental <br /> ' drawings and explanations. <br /> In addition to supplemental drawings furnished by the Engineer, the Contract <br /> Documents may also be supplemented by Type 1, Type 2 or 2E, and Type 3 or 3E <br /> ' Working Drawings prepared by the Contractor, material supplier, or manufacturer, <br /> when necessary or as required by the Contract Documents to detail and illustrate <br /> portions of the Work. All types of Working Drawings shall be reviewed by the Engineer <br /> before work pursuant to those Working Drawings is performed. Type 3 and 3E <br /> Working Drawings may include, and not be limited to, shop details, erection plans, <br /> masonry lay-out diagrams, reinforcing steel and bending diagrams, post tensioning <br /> plans, shoring, cribbing, cofferdam, or falsework plans, formwork plans, or hydraulic <br /> items. Type 2 and 2E Working Drawings may include, and not be limited to, Catalog <br /> cuts or standard plans for commonly used manufactured items. <br /> ' The Contractor shall be fully responsible for the accuracy of dimensions and details on <br /> Working Drawings, and for complete conformity with the Contract Documents, even if <br /> the Working Drawings have been approved by the Engineer, or if the Contractor and <br /> the Engineer agree on dimensions and details. The City does not accept Working <br /> ' Drawings as accurate or adequate, and does not take responsibility for, or warrant that <br /> Working Drawings will meet Contract requirements. <br /> Engineer's review of Working Drawings shall not relieve Contractor from responsibility <br /> for variation from the requirements of the Contract Documents unless Contractor has <br /> in writing called the Engineer's attention to each such variation at the time of <br /> submission, and the Engineer has given written approval of each such variation by a <br /> 1 specific written notation thereof incorporated in or accompanying the returned Working <br /> Drawing; nor will review by Engineer relieve Contractor from responsibility for errors or <br /> omissions in the Working Drawings or from responsibility for having complied with the <br /> ' provisions of this section. <br /> The Bid prices shall include all costs for furnishing Working Drawings and Submittals. <br /> The following listed sections of the Standard Specifications and Special Provisions <br /> ' require Working Drawings that may or may not be applicable to this specific project. <br /> This list is supplied as an aid to the Contractor and is by no means complete. <br /> ' Sewer 0 Division 1 -GENERAL REQUIREMENTS <br /> SP-67 Addendum No. 1 <br /> WO No-UP3691 May 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.