Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' CITY OF EVERETT SPECIAL PROVISIONS [Modified per Addendum #1] <br /> 1-05.6 Inspection of Work and Materials <br /> Supplement 1-05.6 by adding the following: <br /> 1-05.6(1) Demonstration of Compliance with Contract Requirements <br /> The burden of proving the constructed Work complies with the Contract Documents <br /> shall be on the Contractor at all times. The Contractor shall grant the City's <br /> Representative access to the Work and work site and to places where Work is being <br /> prepared, or where materials, Equipment, or machinery are being obtained for the <br /> Work. The Contractor shall provide information requested by the City's Representative <br /> in connection with inspection work. <br /> ' If the Contract Documents, laws, ordinances, or public regulatory authority requires <br /> parts of the Work to be specially inspected, tested, or approved, the Contractor shall <br /> give the City's Representative be not less than two working days prior written Notice of <br /> ' the availability of the subject Work for examination. <br /> Inspection and quality control tests performed on the Contractor's work by the City's <br /> Representative shall not relieve the Contractor of its responsibility for errors or lack of <br /> ' quality therein and shall not be regarded as an assumption of risks or liability by the <br /> City's Representative for the Contractor's compliance with these Contract Documents. <br /> Contractor remains responsible and liable for all errors, defects or a lack of quality not <br /> discovered by inspection or observation. <br /> 1-05.6(2) Manufacturer's Directions <br /> (******) <br /> Manufactured articles, material and Equipment shall be transported, stored, applied, <br /> installed, connected, erected, adjusted, tested, operated and maintained as <br /> recommended by the manufacturer, unless otherwise specified in these Special <br /> Provisions. Provide manufacturer's installation instructions and procedures to the City <br /> prior to installation of the manufactured articles, material and Equipment. <br /> 1-05.6(3) Materials and Equipment Furnished by City <br /> (******) <br /> Contractor shall install materials and Equipment furnished by the City as provided in <br /> the technical sections of the Specifications. Furnishing of material and Equipment by <br /> the City will be considered conclusive evidence of their acceptability for the purpose <br /> intended. If the Contractor discovers defects in material or Equipment furnished by the <br /> City, it shall immediately notify the City. After such discovery, the Contractor shall not <br /> proceed with Work involving City-furnished materials and Equipment unless authorized <br /> ' by the City. Unless otherwise noted or specifically stated, materials and Equipment <br /> furnished by the City, that are not of local occurrence or manufacture, are considered <br /> to be "FOB" railroad station or truck terminal nearest to the site of the Work. At no cost <br /> ' to the City, the Contractor shall unload, transport, store, and protect such material and <br /> Equipment from damage. The Contractor shall inspect such City-furnished material <br /> and Equipment on receipt and provide the City with written acceptance for the <br /> incorporation of said material and Equipment into the Work. After receipt by the <br /> Contractor, the Contractor bears all risk of loss and casualty to City furnished materials <br /> and Equipment. <br /> ' 1-05.7 Removal of Defective and Unauthorized Work <br /> Supplement 1-05.7 by adding the following: <br /> ' If the Contractor fails to remedy defective or unauthorized Work within the time <br /> specified in a written notice from the Engineer, or fails to perform Work required by the <br /> Contract Documents, the Engineer may correct and remedy such Work as may be <br /> Sewer 0 Division 1 —GENERAL REQUIREMENTS Addendum No. 1 <br /> WO No—UP3691 SP—71 May 2020 <br />