My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS [Modified per Addendum #1] <br /> construction of similar type or size projects or relationships on other projects <br /> unsatisfactory to the City or, if the Project is subject to supplemental bidder <br /> responsibility criteria and such criteria contain personnel qualifications, the personnel <br /> differ from those named by Bidder in its pre-Award supplemental bidder responsibility <br /> criteria submittals. City may require removal and replacement of Contractor's <br /> ' supervisory staff who are disruptive or who appear to lack sufficient competence to <br /> complete the Project successfully. <br /> 1-05.18(2) Construction Procedures <br /> iThe Contractor shall supervise and direct the Work and determine the means, <br /> methods, techniques, sequences and procedures of construction, except in those <br /> instances where the City, to define the quality of an item of Work, specifies in the <br /> Contract a means, method, technique, sequence or procedure for construction of that <br /> item of Work. The Contractor shall execute Work in conformity with the standard <br /> practice of the trade. <br /> 1-05.18(3) Responsibilities <br /> 1-05.18(3)A Manufacturers and Suppliers <br /> The Contractor shall be responsible for the adequacy, efficiency and sufficiency of <br /> manufacturers, Suppliers and their employees. <br /> 1-05.18(3)B Contractor's Employees <br /> The Contractor shall be responsible for the adequacy, efficiency and sufficiency of <br /> its employees. Workers shall have sufficient knowledge, skill and experience to <br /> perform properly the Work assigned to them. <br /> 1-05.18(3)C Payment for Labor and Materials <br /> The Contractor shall pay and require its Subcontractors to pay any and all <br /> accounts for labor including Worker's Compensation premiums, State <br /> Unemployment and Federal Social Security payments and other wage and salary <br /> deductions required by law. The Contractor also shall pay and cause its <br /> Subcontractors to pay any and all accounts for services, equipment, and materials <br /> used by him and its Subcontractors during the performance of Work under this <br /> Contract. The Contractor shall pay such accounts as they become due and <br /> payable. If requested by the City, the Contractor shall promptly furnish proof of <br /> payment of such accounts to the City. <br /> 1-05.18(3)D Attention to Work <br /> The Contractor, either in person or acting through its representative, shall give <br /> ' personal attention to and shall manage the Work so that it shall be prosecuted <br /> faithfully and completed under the Project schedule. When its representative is <br /> not personally present at the Project site, its designated alternate shall be <br /> available and shall have the authority to act in matters relating to this Contract. <br /> Where detailed construction requirements are not set forth in the Standard <br /> Specifications or these Special Provisions, the Contractor shall perform the Work <br /> of a quality comparable to the workmanship specified for other parts of the Work, <br /> from firms having established good reputations for similar Work, or by following <br /> industry standard practices. The Contractor shall perform all Work in compliance <br /> with and conforming to applicable building codes in effect at the time the Work is <br /> being performed. <br /> 1-05.18(3)E Safety <br /> The Contractor alone shall be responsible for safety on the job site, including, but <br /> not limited to, the safety of its and its Subcontractor's employees. The Contractor <br /> Sewer 0 Division 1 —GENERAL REQUIREMENTS Addendum No. 1 <br /> WO No—UP3691 SP—77 May 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.