My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS [Modified per Addendum #1] <br /> If requested by the Contractor, the City will arrange meetings with other contractors <br /> performing Work on behalf of the City to plan coordination of construction activities. <br /> The Contractor shall inform itself of the planned activities of other contractors and will <br /> coordinate its Work with the other contractors. <br /> Contractor shall notify the City of problems, interference or any difficulty with other <br /> contractors or workers engaged by the City. The Notice shall be sufficiently prompt <br /> and specific so as to allow the City to mitigate or avoid increased costs, time of <br /> performance, damages or injury. Contractor's failure to provide such Notice in a timely <br /> way shall be deemed a waiver and release of any and all Contract Claims relating to, <br /> arising out of, or caused by, any alleged interference, difficulty or problem with another <br /> contractor or worker engaged by the City. <br /> 1-06 CONTROL OF MATERIAL I <br /> Supplement Section 1-06 as follows: <br /> References to materials shall also mean Contractor furnished Equipment, if any, as <br /> 111 <br /> specified in these Special Provisions. <br /> 1-06.1 Approval of Materials Prior to Use <br /> Revise the first paragraph of 1-06.1 to read as follows. I <br /> Prior to use, Contractor shall notify the Engineer of all proposed materials. Contractor <br /> may use the Qualified Product List (QPL) and the Aggregate Source Approval (ASA) <br /> Database. Contractor shall use the Request for Approval of Material (RAM) form. 111 <br /> Supplement 1-06.1 by adding the following: <br /> Provide product data, when specified, in accordance with 1-05.3(1) SUBMITTALS of <br /> these Special Provisions for inspecting, testing, operating, or maintaining Equipment <br /> and materials supplied as part of the Work. Unless otherwise specified, such data <br /> shall be provided at the time the referenced material or Equipment is delivered to the <br /> job site. Provide data as specified and include, unless otherwise specified, but not be <br /> limited to shop drawings, erection drawings, reinforcing steel schedules, testing and <br /> adjusting instructions, operations manuals, maintenance procedures, parts lists, and <br /> record drawings. Provide data as part of the Work under this Contract and its <br /> acceptability will be determined by the City in its sole discretion. <br /> Further supplement 1-06.1 by adding the following: <br /> 1-06.1(5) Requests for Substitution <br /> The City will not usually consider a substitution for material or Equipment specified by <br /> brand name or manufacturer or sole-sourced. <br /> Only the Contractor may offer materials or Equipment of equal or better quality and <br /> performance as a substitution for those specified. The Contractor shall make <br /> substitution offers in writing to the City's Representative in accordance with 1-05.3(1) <br /> SUBMITTALS of these Special Provisions. The substitution offer must include <br /> sufficient data to enable the City's Representative to assess the acceptability of the <br /> material or Equipment for the particular application and requirements. The City and <br /> City's Representative are not required or obligated to consider or review a request for <br /> substitution and may, in their sole discretion and option, consider or review such <br /> requests. ' <br /> If the offered substitution requires changes to or coordination with other portions of the <br /> Work, include, if any, drawings and details showing such changes. The Contractor <br /> agrees to perform these changes as part of the substitution of material or Equipment at <br /> no additional cost to the City. Approval of a substitution request will not relieve the <br /> Sewer 0 Division 1 —GENERAL REQUIREMENTS Addendum No. 1 <br /> WO No—UP3691 SP—80 May 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.