My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS [Modified per Addendum #1] <br /> 1-06.6 Recycled Materials <br /> Delete 1-06.6 and its subsections and substitute the following: <br /> Make best effort to utilize recycled materials in the construction of the project as <br /> detailed in elsewhere in the Standard Specifications and these Special Provisions. <br /> Prior to Physical Completion report the quantity of recycled materials utilized in the <br /> construction of the project for each of the items listed in Section 9-03.21. Include hot <br /> mix asphalt, recycled concrete aggregate, recycled glass, steel furnace slag and other <br /> recycled materials (e.g. utilization of on-site material and aggregates from concrete <br /> returned to the supplier). Provide report on DOT form 350-075A Recycled Materials <br /> Reporting. <br /> 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC <br /> 1-07.1 Laws to be Observed <br /> Revise 1-07.1 by replacing "WSDOT" with "City" in the next to the last sentence of <br /> paragraph three. <br /> Supplement 1-07.1 by adding the following: <br /> The Contractor shall be in compliance with all applicable standards, orders, or <br /> requirements issued under Section 306 of the Clean Air Act [42 U.S.C. 1857(h)], <br /> Section 508 of the Clean Water Act (33 U.S.C. 1368), Executive Order 11738, and <br /> Environmental Protection Agency Regulations (40 CFR Part 15). (Contracts, <br /> subcontracts, and subgrants of amounts in excess of$100,000). <br /> The Contractor shall comply with mandatory standards and policies relating to energy <br /> efficiency that are contained in the state energy conservation plan issued in <br /> compliance with the Energy Policy and Conservation Act (Pub. L. 94-163). <br /> The City advises all general contractors and subcontractors that numerous Federal, <br /> State, and Local regulations exist that could affect the procedures used in the ' <br /> completion of this project. The City advises each prospective Contractor that they are <br /> responsible to be aware of and comply with all applicable statutes and regulations. It <br /> is recommended that each Contractor contact the local office of the following agencies <br /> for a list of applicable regulations and requirements that might affect the <br /> implementation of this project: <br /> • Federal Environmental Protection Agency <br /> • Washington Department of Health <br /> • Washington Department of Ecology <br /> • Washington Department of Fisheries <br /> • Washington Department of Wildlife <br /> • Washington Department of Labor & Industries <br /> • Puget Sound Air Pollution Control Agency <br /> • Municipal Building Department <br /> • Municipal Planning Department <br /> • Municipal Public Works Department <br /> If the scope of Work in this Contract includes Work at the City of Everett Water <br /> Filtration Plant or the Waste Water Pollution Control Facility, Contractor shall comply <br /> with the requirements of the Washington Department of Labor & Industries for such <br /> work including, but not limited to, Chapter 296-67 WAC. All costs associated or <br /> incurred in complying with these regulations or any other regulations listed above are <br /> included in the Contractor's Proposal. <br /> In cases of conflict between different safety regulations, the more stringent regulation I <br /> shall apply. <br /> Sewer 0 Division 1 —GENERAL REQUIREMENTS Addendum No. 1 <br /> WO No—UP3691 SP—82 May 2020 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.