My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' CITY OF EVERETT SPECIAL PROVISIONS [Modified per Addendum #1] <br /> Comcast City of Everett, Water Division <br /> 1525 —75th Street SW#200 Public Works Department <br /> Everett, Washington 98203 3200 Cedar Street <br /> Everett, Washington 98201 <br /> ' John Warrick John Warrick@cable.comcast.com Attn: Grant <br /> Tel. (425) Moen00 <br /> Casey Brown — Boeing Freeway North City of Everett, Sanitary Sewer Div <br /> ' (425) 263-5345 City of Everett, Water Division <br /> Casey_Brown@cable.comcast.com Public Works Department <br /> 3200 Cedar Street <br /> ' Attn: Shane Turner Everett, Washington 98201 <br /> Tel. (425) 316-9405 Attn: Grant Moen <br /> Email: Shane_Turner@cable.comcast.com Tel. (425) 257-8800 <br /> Sprint City of Everett, Storm Water Div <br /> ' 2210 S 35th St 3200 Cedar Street <br /> Tacoma, WA 98409 Everett, Washington 98201 <br /> Attn: Steven Schauer Attn: Grant Moen <br /> ' Tel. (360) 402-4159 (Cell) Tel. (425) 257-8800 <br /> Email: steven.schauer@sprint.com <br /> ' Wave Broadband Attn: Jim Biggs City of Everett, Traffic Division <br /> Public Works Department <br /> (206) 786-8720 3200 Cedar Street <br /> ' jbigs@wavebroadband.com Everett, Washington 98201 <br /> Attn: Tim Miller <br /> Tel. (425) 257-8800 <br /> ' 1-07.17(1) Utility Construction, Removal or Relocation by Contractor <br /> Delete all three paragraphs of 1-07.17(1) and substitute the following: <br /> ' If the Work requires removing or relocating a utility, utility owners or their <br /> contractors will furnish all work necessary to adjust, relocate, replace, or construct <br /> their facilities. <br /> ' 1-07.17(2) Utility Construction, Removal or Relocation by Others <br /> Revise the first paragraph of 1-07.17(2) as follows: <br /> ' Any authorized agent of the City or utility owners may enter the City right-of-way <br /> or easement to repair, rearrange, alter, or connect their equipment. The Contractor <br /> shall cooperate with such effort and shall avoid creating delays or hindrances to <br /> those doing the Work. The Contractor shall arrange to coordinate work schedules <br /> as needed. <br /> I <br /> ' Sewer 0 WO No—UP3691 Division 1 —GENERAL REQUIREMENTS Addendum No. 1 <br /> SP—91 May 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.