My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS [Modified per Addendum #1] <br /> I DIVISION P - PROPOSAL <br /> CITY OF EVERETT,WASHINGTON <br /> ISEWER PROJECT "0" UTILITY UPGRADES <br /> WORK ORDER#UP3691 <br /> 111 To the City Council <br /> Everett, Washington <br /> I <br /> I The undersigned Bidder declares that he has carefully examined the Plans and Specifications,Notice to <br /> Contractors, Standard Specifications, Special Provisions, Appendix, Proposal, and Contract for the <br /> construction of approximately 2,900 linear feet of sewer main, 1,800 linear feet of water main, traffic <br /> signal and illumination system upgrades and other such Work as may be necessary, in accordance <br /> I with the Specifications, as shown on the Plans. The undersigned declares that he has made such <br /> investigations as are necessary to determine the conditions to be encountered, and that, if this Proposal <br /> is accepted, he will enter into a contract with the City of Everett, Washington, in the fouu of Contract <br /> I hereto annexed, he will, to the extent required, provide the necessary equipment, tools, apparatus, and <br /> other means of construction, and he will furnish all labor and materials necessary to complete the Work <br /> in the manner herein specified and according to the requirements of the Engineer. <br /> IThe undersigned Bidder certifies that this Proposal is in all respects fair and is made without collusion <br /> on the part of any person, film or corporation mentioned below, and no officer or employee of the City <br /> of Everett is personally or financially interested, directly or indirectly, in the Proposal or in any purchase <br /> I of or sale of any materials or supplies for the Work to which it relates, or any portion of the profits <br /> thereof. <br /> I The undersigned Bidder agrees that he will complete the Work in all respects as required by Division C, <br /> Article 2. Time for Completion and that he will pay liquidated damages to the City in the amount <br /> specified in the Contract. <br /> I Accompanying this Proposal is a bid bond or certified check in the amount of five percent (5%) of the <br /> Proposal according to the conditions of the "Notice to Contractors" and "Division 1 - General <br /> Requirements" hereby attached. If this Proposal shall be accepted by the City of Everett, Washington, <br /> I and the undersigned shall fail to execute a satisfactory contract and bond, as stated in the Division 1 — <br /> General Requirements hereto attached, within 14 calendar days after the Award Date,then the City may, <br /> at its option, deteninine that the undersigned has abandoned the Contract and thereupon this Contract <br /> I shall be null and void and the amount of the bid bond or certified check accompanying this Proposal <br /> shall be forfeited and become the property of the City of Everett, Washington. <br /> I <br /> I <br /> I <br /> Sewer 0 Division P—PROPOSAL Addendum No. 1 <br /> WO No.—UP3691 SP—21 May 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.